Duplex 8'x12' Lift Station to
Pump Process and Storm Water
SITE DETAILS
Power demands in this area had outreached the ability of the
local power company to provide service. A design was put in
place to build a natural gas turbine generator to be used as a
peaker plant. The equipment supplied for the peaker plant
generated process water, the site work also provided for site
drainage that needed to be pumped through a package treatment
facility and then on to the City's sanitary sewer. Romtec was
chosen as the solution for this complicated pumping
requirement.
Construction of a new power generation plant required a series
of lift stations to pump process water and site storm water to
an on site treatment facility and then off site to the city's
sanitary sewer system
THIS ROMTEC UTILITIES SYSTEM
INCLUDED
Romtec Utilities
recommended: MultiTrode MT2PC controller
Concrete wet well:
Fall & confined space entry control, pedestrian rated
hatch
Piping &
accessories: All stainless steel
ITT Flygt pumps:
CP3085 MT, 3 HP
Level monitoring &
control: Primary - MultiTrode probes, Redundant /
back-up - MultiTrode probe w/MTR relays
Electrical controls:
UL listed
Communication:
Facilities existing monitoring system and localized alarming,
beacon