City of Santa Barbara|Santa Barbara, CA|1,500 GPM - 66' TDH

jweddell1,000gpm - 5,000gpm, Airports, Pacific, Sewer System Expansion, Wastewater

This lift station serves a large area and was installed at Santa Barbara Municipal Airport as part of a larger project. Two submersible solids handling pumps are supported by a jockey pump that acts as a sump pump for periods of low flow. An impressive control building contains the UL listed control panel, a backup diesel generator and automatic transfer switch, electric meter main, and ferrous chloride odor controls. The electrical controls interface directly with the existing detailed SCADA system used by the Goleta Sanitary District.