Basin Electrical Power Cooperative – Industrial Wastewater Pumping

Basin Electrical Power Cooperative Basin Electrical Power Cooperative
Installation of the Basin Electrical Power Cooperative – Industrial Wastewater Pumping Installation of the Basin Electrical Power Cooperative – Industrial Wastewater Pumping
Basin Electrical Power Cooperative – Industrial Wastewater Pumping Control Panel Basin Electrical Power Cooperative – Industrial Wastewater Pumping Control Panel
Control Panel for the Basin Electrical Power Cooperative – Industrial Wastewater Pumping Control Panel for the Basin Electrical Power Cooperative – Industrial Wastewater Pumping
Basin Electrical Power Cooperative – Industrial Wastewater Pumping Project Basin Electrical Power Cooperative – Industrial Wastewater Pumping Project

Project Assets

Project Description

This power generation facility installed a package lift station designed for medium sewage flows of industrial wastewater. To protect the submersible solids-handling pumps, an inlet line deflector panel was included in the design. The wet well was protected from off-gassing and corrosion by an interlocking fiberglass lining. Conductive probes are used for primary and backup liquid level-sensing with an outdoor UL listed control panel. The panel is outfitted with a basic alarm and an autodialer for telecommunications.

What Romtec Utilities Provided

  • Lift Station Design & Engineering
  • Package Lift Station Supplier
  • Package Lift Station Manufacturer
  • On-Site Lift Station Construction Adviser
  • On-Site Start-Up Management
100 25′
GPM TDH

Why They Chose Romtec Utilities

The Basin Electrical Power Cooperative fulfills the electricity needs for rural members across several US states, and the Culbertson Generation Station was built to meet the power demands of the Cooperative members. Romtec Utilities worked with The Industrial Company (TIC) Wyoming, Inc. to design the industrial wastewater lift station for this plant. Basin Electrical Power Cooperative and TIC wanted to move fast; the entire plant was to be operational in 14 months from the start of construction. Romtec Utilities worked quickly to generate appropriate designs and system capabilities for meeting sophisticated industrial standards while also meeting the schedule of TIC and Basin Electrical Power Cooperative.

Culbertson, CA|100 GPM – 25′ TDH