British Petroleum Cherry Point Refinery – Industrial Stormwater Runoff

British Petroleum Cherry Point Refinery British Petroleum Cherry Point Refinery
British Petroleum Cherry Point Refinery – Industrial Stormwater Runoff Project Install British Petroleum Cherry Point Refinery – Industrial Stormwater Runoff Project Install
British Petroleum Cherry Point Refinery – Industrial Stormwater Runoff Project British Petroleum Cherry Point Refinery – Industrial Stormwater Runoff Project
British Petroleum Cherry Point Refinery – Industrial Stormwater Runoff Project British Petroleum Cherry Point Refinery – Industrial Stormwater Runoff Project
Control Panel for the British Petroleum Cherry Point Refinery – Industrial Stormwater Runoff Project Control Panel for the British Petroleum Cherry Point Refinery – Industrial Stormwater Runoff Project

Project Assets

Project Description

This package lift station handles the medium flows of stormwater and process water drainage at this oil refinery. A stormwater plan is required at most industrial facilities and BP proactively chose a reliable lift station to manage its environmental footprint. Duplex submersible centrifugal pumps and a below grade valve assembly comprise the major underground components of this system. An outdoor control panel utilizes float controls and an ultrasonic transducer for primary and backup liquid level-sensing.

What Romtec Utilities Provided

  • Lift Station Design & Engineering
  • Package Lift Station Supplier
  • Package Lift Station Manufacturer
  • On-Site Lift Station Construction Adviser
  • On-Site Start-Up Management
350 30′
GPM TDH

Why They Chose Romtec Utilities

When working in the field of oil and gas, experience is a major consideration. Jacobs Engineering Group was the site engineer on a project for the British Petroleum Cherry Point Refinery, and they received a referral to Romtec Utilities from another gas plant with a similar stormwater lift station. For Jacobs Engineering, Romtec Utilities provided site specific designs and budgetary numbers that Jacobs Engineering used to take the project to bid. IMCO General Construction, Inc. was awarded the project, and Romtec Utilities helped get the final designs approved. In the end, the British Petroleum Cherry Point Refinery received an economical and appropriate stormwater lift station for a oil and gas refinery.

Bellevue, WA|350 GPM – 30′ TDH