Chobani, Inc. – Integrated Wastewater Lift Station

Chobani, Inc. Project Site Chobani, Inc. Project Site
Chobani, Inc. – Integrated Wastewater Lift Station Project Site Chobani, Inc. – Integrated Wastewater Lift Station Project Site
Control Panel for the Chobani, Inc. – Integrated Wastewater Lift Station Control Panel for the Chobani, Inc. – Integrated Wastewater Lift Station
Control Panel Chobani, Inc. – Integrated Wastewater Lift Station Control Panel Chobani, Inc. – Integrated Wastewater Lift Station
Wastewater Lift Station for Chobani, Inc. – Integrated Wastewater Lift Station Wastewater Lift Station for Chobani, Inc. – Integrated Wastewater Lift Station

Project Assets

Project Description

A second lift station was added shortly after the plans for the Chobani , Inc. manufacturing facility revealed larger flows of wastewater. Similar to the first, this lift station uses two submersible centrifugal pumps to discharge effluent to a pre-treatment facility. The force main length to the pre-treatment facility created low head conditions with medium pumping flows. The system valves are integrated into the discharge pumping to simplify the design and lower the cost, and a simple wall mounted control panel provides uncomplicated system controls.

What Romtec Utilities Provided

  • Lift Station Design & Engineering
  • Package Lift Station Supplier
  • Package Lift Station Manufacturer
  • On-Site Lift Station Construction Adviser
  • On-Site Start-Up Management
83 16′
GPM TDH

Why They Chose Romtec Utilities

Romtec Utilities was chosen for this additional lift station because CH2M Hill (Civil E.) and Chobani, Inc. were satisfied with the services provided by Romtec Utilities during the design of the first lift station. This lift station needed to be designed and supplied in a much shorter timeframe than the first project because the Chobani yogurt plant was beginning the construction phases. McAlvain Construction, Inc. (GC) and Romtec Utilities worked quickly to get the plans finalized and approved through a CH2M Hill engineering review. After approval, Romtec Utilities provided an on-site installation advisor to assist with fast and trouble-free installation for both lift stations.

Twin Falls, ID|83 GPM – 16′ TDH