City of Port Orchard – Residential Development Wastewater Lift Station

City of Port Orchard City of Port Orchard
Lift Station with Below Grade Vault Lift Station with Below Grade Vault
City of Port Orchard Wastewater Lift Station City of Port Orchard Wastewater Lift Station
Control panel for the City of Port Orchard – Residential Development Wastewater Lift Station Control panel for the City of Port Orchard – Residential Development Wastewater Lift Station
City of Port Orchard – Residential Development Wastewater Lift Station City of Port Orchard – Residential Development Wastewater Lift Station

Project Assets

Project Description

The McCormick Woods northern development purchased this lift station configured to meet the medium flow requirements for municipal sewage. This package lift station was needed because of the uneven terrain surrounding the development. Two submersible solids handling pumps pump to a below-grade valve assembly containing the lift station valves and access ports. A sheltered PLC control panel utilizes a pressure transducer for primary liquid level-sensing with backup float controls. The panel is tied to an onsite generator for emergency backup power.

What Romtec Utilities Provided

  • Lift Station Design & Engineering
  • Package Lift Station Supplier
  • Package Lift Station Manufacturer
  • Lift Station Site Plan Layout Designer
  • On-Site Lift Station Construction Adviser
  • On-Site Start-Up Management
200 64′
GPM TDH

Why They Chose Romtec Utilities

Barghausen Consulting Engineers led a development project in Port Orchard, Washington. The project civil engineering firm, N.L. Olson and Associates, contacted Romtec Utilities to provide the subdivision lift station design. Romtec Utilities also provided budgetary numbers for N.L. Olson and to the awarded contractor, Rotschy Inc. With the budgetary numbers in place, Romtec Utilities worked with N.L. Olson and the City of Port Orchard to get the lift station designs approved. After the designs were approved and finalized, Rotschy purchased the packaged lift station and installed it. Romtec Utilities was able to help the developer get their lift station approved and constructed so they could complete their development.

Port Orchard, WA|200 GPM – 64′ TDH