New Continuation High School – Packaged Wastewater Lift Station

This is the City of Bakersfield Seal This is the City of Bakersfield Seal
Installation of the New Continuation High School – Packaged Wastewater Lift Station Installation of the New Continuation High School – Packaged Wastewater Lift Station
Install of the New Continuation High School Wastewater Lift Station Install of the New Continuation High School Wastewater Lift Station
Wastewater Lift Station for the New Continuation High School Wastewater Lift Station for the New Continuation High School
Control Panel for the New Continuation High School – Packaged Wastewater Lift Station Control Panel for the New Continuation High School – Packaged Wastewater Lift Station

Project Assets

Project Description

A new school required this low flow package lift station in order to handle the neighborhood’s increased flow of municipal wastewater. Ebara vortex pumps in a duplex configuration are used for deep well pumping. They are explosion proof in order to meet the Class 1, Division 1 hazardous location requirements. A below-grade valve vault provides easy access to system plug valves, shut-off valves, and swing check valves. An outdoor UL listed control panel manages the lift station’s mechanical and electrical systems with float controls for liquid level-sensing and a basic alarm.

What Romtec Utilities Provided

  • Lift Station Design & Engineering
  • Package Lift Station Supplier
  • Package Lift Station Manufacturer
  • On-Site Lift Station Construction Adviser
  • On-Site Start-Up Management
55 38.5′
GPM TDH

Why They Chose Romtec Utilities

McIntosh and Associates (Civil E.) contacted Romtec Utilities to design and supply a packaged wastewater lift station for a new high school. Klassen Corporation, the general contractor, and McIntosh and Associates worked with Romtec Utilities to finalize and approve a lift station design with the City of Bakersfield. Once the Romtec Utilities design and scope of work submittal was approved, Aleco Corporation was selected for its bid for the underground construction and lift station installation. Romtec Utilities provided Aleco Corporation with an on-site construction advisor and provided the city with lift station start-up services and on-site training for maintenance staff.

Bakersfield, CA|55 GPM – 38.5′ TDH