West Mesa Industrial Park – Septic System Replacement Lift Station
Project Description
The US Army Corps of Engineers worked with Romtec Utilities to design this lift station to replace an existing septic system. The resulting package wastewater lift station met the high sewage flows of this publicly owned industrial complex. The submersible sewage pumps in a duplex configuration are explosion proof to meet the wet well space classification. An outdoor UL listed panel utilizes floats and a pressure transducer for intrinsically safe level controls. It also includes an autodialer for communications and a blower for odor control.
What Romtec Utilities Provided
- Lift Station Design & Engineering
- Package Lift Station Supplier
- Package Lift Station Manufacturer
- Lift Station Site Plan Layout Designer
- On-Site Lift Station Construction Adviser
- On-Site Start-Up Management
733 | 44′ |
GPM | TDH |
Why They Chose Romtec Utilities
Federally funded projects can carry additional requirements beyond the normal bid process. Romtec Utilities worked within these requirements to design and supply a wastewater lift station to the US Army Corps of Engineers (USACE) under its GSA contract. To accomplish this, Romtec Utilities worked with the USACE and the City of Las Cruces to design a lift station capable of handling existing and future flow requirements. To comply with federal regulation, the bidding contractors were required to be classified as 8(a), and Pate Construction Company, Inc. won the job. Romtec Utilities worked with all the agencies involved to satisfy requirements while providing a federal discount with its GSA contract.