SITE DETAILS
New 200-unit single family & 200 unit multi- family
residential development. Due to lack of capacity in the
existing storm drain channel a detention pond was required and
a method of draining the pond after a storm, thus requiring a
lift station. Romtec Utilities was the solution.
Storm run-off for 200 units of single-family and 200 units of
multi-family town homes. Two pumps, each producing 1581 GPM @
24.4' TDH, drain a 20-million gallon detention basin @ 3100
GPM
THIS ROMTEC UTILITIES SYSTEM
INCLUDED
City specified:
MultiTrode MT2PC controller
Concrete wet well:
fall & confined space entry control, pedestrian rated
hatch
Piping &
accessories: all stainless steel
ITT Flygt pumps:
NP3153 MT, 15 HP
Level monitoring &
control: Primary - MultiTrode probe, Redundant / Back-up
- MultiTrode probe w/MTR relays
Generator: Cummins 50
kW, diesel fuel & trailer mounted
Electrical controls:
UL listed
Communication:
Localized alarming, beacon