SITE DETAILS
New 77 lot residential subdivision. Due to site topography, subdivision's sewer terminated approximately 30' below the nearest gravity sewer, thus requiring a lift station. Romtec Utilities was the solution.
Supplied to a 77 Lot Subdivision with small 1,850 sq. ft. lift
station site, 191 GPM @ 69' TDH (duty point)
THIS ROMTEC UTILITIES SYSTEM
INCLUDED
City specified:
Multitrode MT2PC controller, SCADA system, auxiliary power
& hydrogen sulfide control system
Concrete wet well:
fall & confined space entry control, pedestrian-rated
hatch
Pump disconnect
panel: with free-air stand, cable hatch
Davit crane: Thern
5124 crane with hand winch
Piping &
accessories: all stainless steel
ITT Flygt pumps:
NP3127 HT, 10 HP
Level monitoring &
control: Primary - MultiTrode probe, Redundant/Back-up -
MultiTrode probe w/MTR relays
Concrete valve vault:
Pedestrian-rated hatch, 4" system, check & plug valves,
discharge pressure gauge
Generator: Cummins 42
kW w/A.T.S., natural gas fuel
Building: Romtec
12'-8" X 16'-8" split-face concrete building
Electrical controls:
UL listed
Communication:
Cellular SCADA and alarming system
Hydrogen sulfide
control: Air injection system