Duplex 6'x20' Lift Station for
51 Lots • 122gpm
SITE DETAILS
New 51 lot residential subdivision. Due to site topography,
subdivision's sewer terminated approximately 100' below the
nearest gravity sewer, thus requiring a lift station. Romtec
Utilities was the solution.
Supplied to a 51 Lot Subdivision with dedicated lift station
site, 122 GPM @ 132' TDH (duty point)
THIS ROMTEC UTILITIES SYSTEM
INCLUDED
City specified: PLC
controller, SCADA system, auxiliary power & chemical feed
system
Concrete wet well:
fall & confined space entry control, interior coating
Pump disconnect
panel: with free air stand, cable hatch
Davit crane: Thern
5124 crane with hand winch
Piping &
accessories: all stainless steel
ITT Flygt pumps:
NP3153 HT, 18 HP
Level monitoring &
control: Primary -MultiTrode probe; Redundant / back-up
- Multitrode probe w/MTR relays
Concrete valve vault:
fall & confined space entry control, 4" system, check &
plug valves, discharge pressure gauge, by-pass pumping port
Concrete meter vault:
Siemens Mag-meter, by-pass piping & valves
Generator: Cummins 60
kW w/A.T.S., NG fuel, sound attenuation
Weather shelter: post
& beam open structure
Electrical controls:
UL listed
Communication: radio
modem, SCADA system
Odor control: US
Filter Bioxide chemical feed system