Duplex 6'x28' Lift Station for
130 Lots • 173gpm
SITE DETAILS
New 130 lot residential subdivision. Due to site topography, subdivision's sewer terminated approximately 152' below the nearest gravity sewer, thus requiring a lift station. Romtec Utilities was the solution.
Supplied to a 130 Lot Subdivision with dedicated lift station
site; 173 GPM @ 203' TDH (duty point)
THIS ROMTEC UTILITIES SYSTEM
INCLUDED
City specified:
MultiTrode controller, SCADA system, auxiliary power & odor
control system
Concrete wet well:
fall & confined space entry control, H-20 rated hatch,
interior coating
Pump disconnect
panel: with free air stand, cable hatch and cable hatch
extension
Piping &
accessories: all stainless steel
ITT Flygt pumps:
NP3153 SH, 23 SH
Level monitoring &
control: Primary - MultiTrode probe; Redundant/Back-up -
MultiTrode probe w/MTR relays
Concrete valve vault:
H-20 rated hatch, 4" system, check & plug valves, discharge
pressure gauge, by-pass pumping port
Generator: Cummins 60
kW w/A.T.S., diesel fuel, sound attenuation
Weather shelter:
post/beam open structure
Electrical controls:
UL listed
Communication:
telephone alarming, SCADA system
Odor control: Tri-Med
Oxidizer 2000