Duplex 6'x29' Lift Station for
52 Lots • 426gpm
SITE DETAILS
New 52 lot residential subdivision. Due to site topography, subdivision's sewer terminated approximately 21' below the nearest gravity sewer, thus requiring a lift station. Romtec Utilities was the solution.
Supplied to a 52 Lot Subdivision with dedicated lift station
site; 426 GPM @ 24' TDH (duty point)
THIS ROMTEC UTILITIES SYSTEM
INCLUDED
City specified:
Multitrode MT2PC controller and MultiTrode MonitorPro SCADA
system, auxiliary power
Concrete wet well:
fall & confined space entry control, pedestrian-rated
hatch
Pump disconnect
panel: with free-air stand, cable hatch
Davit crane: Thern
5124 crane w/hand winch
Piping &
accessories: all stainless steel
ITT Flygt pumps:
NP3102 MT, 5 HP
Level monitoring &
control: Primary - MultiTrode probe; Redundant/Back-up -
MultiTrode probe w/MTR relays
Concrete valve vault:
Pedestrian rated hatch, 4" system, check & plug valves,
discharge pressure gauge
Generator: Cummins 35
kW w/A.T.S., diesel fuel
Building: 6'-8" X
8'-8" split face block Romtec building
Electrical controls:
UL listed
Communication: Radio
SCADA and alarming system