Duplex 6'x34' Lift Station for
221 Lots • 525gpm
SITE DETAILS
New 221 lot residential subdivision. Due to site topography,
subdivision's sewer terminated approximately 29' below the
nearest gravity sewer, thus requiring a lift station. Romtec
Utilities was the solution.
Supplied to a 221 Lot Subdivision with dedicated lift station
site; 525 GPM @ 94' TDH (duty point)
THIS ROMTEC UTILITIES SYSTEM
INCLUDED
City specified: ITT
Flygt FMC controller, SCADA, odor control system
Concrete wet well:
fall & confined space entry control, H-20 rated hatch,
interior coating
Piping &
accessories: all stainless steel
ITT Flygt pumps:
NP3153 HT, 20 HP
Level monitoring &
control: Primary - ITT Flygt pressure transducer,
Redundant / Back-up - ITT Flygt floats w/MTR relays
Concrete valve vault:
H-20 rated hatch, 6" system, check & operational valves,
discharge pressure gauge, by-pass pumping port
Generator: Cummins 40
kW, diesel fuel & trailer mounted
Electrical controls:
UL listed
Communication:
telephone alarming, SCADA system
Odor control: Wet
well exhaust fan