(Click to expand and read more about each feature.)

Get HRSG Pumping for High-Temperature Water Conditions

Romtec Utilities engineers pumping systems capable of handling the extremely hot water produced by Heat Recovery Steam Generators. Our systems integrate heat resistant components that stand up to the water conditions for this application.

Complete Design Engineering Documents with Full Scope of Supply & Services

Our lift stations are each designed and specified to meet specific requirements for each project. We supply complete engineering documents with component data sheets, site plan equipment layouts, scope of supply, and scope of services to detail the complete system from engineering through installation.

Integrate Your HRSG Pumping System with SCADA and Other Electrical Controls

Our electrical engineers are experienced at working with industrial clients to supply the very best electrical control panels for our HRSG pumping systems. This includes integrating new controls into SCADA systems and other existing electrical control systems at power generating facilities.

We Meet Special Design Requirements that are Unique to Your Project Needs

Not every HRSG system is the same, and the pumping systems and specifications can also change from plant to plant. Whether it’s handling water from other inlet lines or pumping to force mains for reuse circulation or treatment, Romtec Utilities will meet your exact pumping system needs.

HRSG Pumping Projects

Getting a HRSG Pumping Station

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process; from Preliminary Designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty. At Romtec Utilities, we stand behind our products, and strive to provide the most robust system possible for the given application, while also meeting the budgetary goals for your project.

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with the all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel. Romtec Utilities aims to not only design and supply complete systems, but to help to ensure the success of the system and all who are involved. Having our experienced field technicians on-site should provide a great sense of quality assurance knowing that the station will operate as designed and the personnel responsible for maintenance and upkeep will be prepared.