Residential Development
Sewer, Stormwater, & Booster Pump Stations for New Residential Developments
Romtec Meets Your Pump Station Development Timelines
Working with developers to meet timelines is one of our top selling features. Developers love the speed at which Romtec Utilities helps engineer and deliver complete pump stations for new residential development sewer systems. Our speed helps developers get to selling homes faster.
Romtec Provides Experience & Assistance with the Public Design Approval Process
Gaining public approval is a required step for developers. Romtec Utilities makes it simple by working with you, and the public agencies, to ensure that the pumping system we supply will meet all design requirements to get the sewer lift station approved and the development moving forward.
Romtec Provides Expertise for Residential Sewer Systems
Romtec Utilities helps developers overcome any and all design, engineering, and construction challenges related to a lift station for residential sewer. Scenarios like joining an existing force main, odor control, sound attenuation, and other residential considerations are made simple with our experience and expertise.
Get Systems Designed for Now & Future Development Phases
Romtec Utilities helps many developers every year procure sewer lift stations that are engineered to match phases of the development, spreading construction costs to later phases. From pump sizing to scalable controls, Romtec Utilities has the experience needed to engineer residential sewer lift stations that meet different pumping requirements at different development phases.
View Residential Development Projects
City of Granbury, TX | Wastewater Package Pump Station
486 GPM | 29′ TDH
Romtec Utilities worked directly with the developer Lakeside at Granbury by Dolce Vita to design and supply the package wastewater lift station.
West Sound Utility District | Wastewater Pump Station
280 GPM | 145.2′ TDH
Romtec Utilities worked with two different developers and the West Sound Utility District for the supply of a wastewater lift station.
City of Bakersfield | Wastewater Pump Station
450 GPM | 50′ TDH
The Highgate Community project is a project that required more than just a basic system. This is a Wastewater pump station in Bakersfield, California, constructed to serve a new development by Castle and Cooke.
Clark County Water Reclamation District | Wastewater & H2S Capable Lift Station
70 GPM | 47′ TDH
Romtec Utilities designed and supplied a wastewater lift station for a housing development in Las Vegas, Nevada.
Clark Regional Wastewater District | Wastewater Lift Station
392 GPM | 88.6′ TDH
Romtec Utilities was contacted to provide the design and supply of a wastewater lift station as a complete package for a new housing development in Vancouver, Washington.
City of San Mateo | Urban Housing Development Lift Station
1218 GPM | 96′ TDH
After the historic Bay Meadows racetrack closed down, a large residential development began that required this large wastewater lift station.
Getting a Mixed Use Development Pump Station
Engineering
Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.
Project Support
With Romtec Utilities you gain the support of our dedicated project management team at every step – from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.
Manufacturing
Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction costs and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site, everything will function as designed.
Construction
Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.
Commissioning
Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation, our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.
Warranty
With Romtec Utilities, every complete pumping system is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.