Greywater Reuse

Pump Stations for “Purple Pipe” & Greywater Pumping

Purple Pipe Reclaimed Water

Get a System Engineered to Meet Your Specific Goals for Greywater Reuse

From sinks to ornamental landscape irrigation, greywater can be reused in many ways. Romtec Utilities will help engineer your pumping system to collect and deliver greywater exactly where you want it.

Get Complete Engineering Documents with O&M Manuals

Your system will be engineered with comprehensive documentation complete with component specifications and datasheets, scope of supply, and our full scope of services. You will also receive O&M documents for the long-term operation and training of your stormwater pump station.

Romtec Utilities Prefabricates Aspects of Your System for Easy Installation

Romtec Utilities provides multiple levels of prefabrication on our pump stations for greywater reuse systems. When your pump station arrives, installation is quick and straightforward for your installing contractor with our staged deliveries ready for installation.

We Commission & Test Your System & Train Your Operations Personnel

Once your pump station is installed, a Romtec Utilities technician commissions and tests the complete system and performs training for operation personnel. You also receive complete O&M documents to ensure the long-term success of your greywater reuse pumping system.

Greywater Reuse Projects

Hesperia
City of Hesperia | Booster Station
700 GPM | 150′ TDH

The City of Hesperia Booster station receives water from the Victor Valley Reclamation facility, which discharges reclaimed water into tanks adjacent to the booster station.

East-Bay-Municipal-District
East Bay Municipal Utility District | Water Treatment Settling Pond
2085 GPM | 118′ TDH

Refurbishing a shut-down water treatment plant required a new pump station to pump high flows of water. The unique application drains water used in a cleaning process into a large settling pond.

PERC-Water
Pacific Grove Golf Course | Wastewater Pump Station for Effluent Recycling
230 GPM | 18.5′ TDH

The Pacific Grove Golf Course in California needed a wastewater lift station to pump medium flows of raw sewage to an effluent treatment and recycling system.

Getting a Greywater Reuse Station

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.