Water Recirculation

Pump Stations to Handle All Flow Rates of Water Recirculation

Industrial Site

Recirculation Pumps will Handle the Full Range of Your Pumping Needs

Romtec pumping systems for recirculating water will meet any and all requirements, whether it’s pumping water into a system at a static or a variable pumping rate. Using techniques like jockey pump and variable frequency drives (VFDs), we can ramp up and pull back the pumps to match your recirculation needs in real-time.

Get the Pumps You Want for Your New Recirculation Pumping System

Romtec Utilities works with all pump manufacturers and technologies to make sure our clients get what they want. From turbine pumps to submersible centrifugal pumps, we have experience engineering pumping systems with any pumps and with all the major brands.

Romtec Technician Comes to Your Site for Start-Up, Testing, & Training Services

Each of our pumping systems is completed by commissioning the system and providing system testing and training for your staff. This ensures that your system is completely operational to meet the design requirements, and that your operation personnel are familiar with running the system.

Complete O&M Documentation & Romtec Utilities Support for Operation

Even after training, turnover or operation changes may require more support after the 1-year warranty. Romtec Utilities provides complete O&M documents to help with long-term management of the system. We also provide support personnel for assistance over the phone.

Water Recirculation Projects

Hesperia
City of Hesperia | Booster Station
700 GPM | 150′ TDH

The City of Hesperia Booster station receives water from the Victor Valley Reclamation facility, which discharges reclaimed water into tanks adjacent to the booster station.

East-Bay-Municipal-District
East Bay Municipal Utility District | Water Treatment Settling Pond
2,085 GPM | 118′ TDH

Refurbishing a shut-down water treatment plant required a new pump station to pump high flows of water. The unique application drains water used in a cleaning process into a large settling pond.

City of Brawley
City of Brawley | Wastewater Treatment Improvements
1,350 GPM | 25′ TDH

The City of Brawley needed this packaged lift station to handle high flows of wastewater at its municipal treatment plant.

Getting a Water Recirculation Station

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.