High/Low pH
Systems Designed for Handling Acidic & Basic Water
Robust Structural Options for Handling Caustic Water Conditions
There are many materials suitable for use with caustic water like concrete, fiberglass, and stainless steel. There are also many types of coatings and liners for any structure, including double-wall containment with leak detection. Romtec Utilities engineers robust pumping systems with any and all material options.
We Work with Any Brand of Pumps, Valves, & Other Robust System Components
Romtec Utilities works with any and all brands for pumps, valves, meters, level sensors, controllers, and any other system components. You will get the specified components you prefer and that will meet the water pH requirements of your specific system.
Get Electrical Expertise to Develop the Best System Controls
Romtec Utilities provides complete electrical engineering and specifications for difficult to pump water, including cable coatings and custom alarms. You can get the exact control system you need, including MCC configurations, SCADA integration, cellular telemetry, and more. We make it easy to monitor and operate your system.
Your System Includes a 1-Year Warranty After Testing & Training
After Romtec Utilities commission’s your pumping system for high/low pH water, our technician will perform testing and training on all aspects of the system design. Once fully tested, Romtec Utilities will warranty the entire system and train your operations personnel on its use.
High/Low pH Projects
Takara Sake USA Inc. | Food-Process Pump Station
512 GPM | 29.1′ TDH
In the Takara Sake project, Romtec Utilities supplied an industrial food-process pump station to Takara Sake USA Inc., a Sake manufacturer based in Berkeley, California.
Orlando Utility Commission | HRSG Blowdown Pump Station
100, 800 GPM | 85.6′, 135′ TDH
Romtec Utilities was hired to design and supply pump stations to support a combined-cycle power generation process that requires significant amounts of recirculated water to function for the Orlando Utility Commission in Orlando, FL.
Middletown Energy Center | HRSG Water Treatment Pump Station
40 GPM | 25′ TDH
Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system.
Kings Mountain Energy Center | HRSG Blowdown Pumping
480 GPM | 35′ TDH
A new HRSG system required 3 industrial pump stations to provide water for its processes. This HRSG blowdown pump station needed to handle extreme pumping conditions.
Dan River Steam Station | Combined Cycle Blow Down Pumping
300 GPM | 20′ TDH
Duke Energy replaced the Dan River Steam Station with a new gas fired power plant and needed a new pump station to handle medium flows of blow down water from the heat recovery steam generator.
Exelon West Medway Generating Station | Power Plant Pumping Systems
30 – 70 GPM | 10′ – 35′ TDH
The expansion of the Exelon Medway Generating Station required four unique pump stations to support future operations.
Getting a High/Low pH Station
Engineering
Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.
Project Support
With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.
Manufacturing
Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.
Construction
Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.
Commissioning
Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.
Warranty
With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.