Now & Future Expansions

Pump Stations Designed for Long-Term Projects & Phases

Odor Control System and Control Building

We Have Completed Dozens of Future-Expansion-Ready Developments

A common long-term strategy to save money on a pumping system is to engineer the system to meet current requirements with capabilities to upgrade the system in the future. Romtec Utilities helps clients get pumping systems that meet these goals all the time.

Our Engineering Documents Detail the Current & Future System Performance

It is very important to have detailed engineering documents that represent the current and future system designs. Romtec Utilities makes sure that the correct power supply, vault sizes, force mains, and other features are all suitable for current and future needs or that a plan is in place to upgrade necessary services when they are needed.

We Complete Startup, Testing, & Training on Your Pump Station

After your pumping system is installed, Romtec Utilities commissions the station and provides testing and training services.

Support from Romtec is Available Even After the Warranty Period

Romtec Utilities supports our pump station and our clients even after the warranty period has expired. As your pump station approaches the need to upgrade to full capacity, Romtec Utilities can assist in evaluating your equipment needs and providing other forms of on-site support.

View Now & Future Expansion Projects

Clark Regional 400X400
Clark Regional Wastewater District | Industrial Sewer Lift Station
82 GPM | 19.7′ TDH

Located at the northeastern edge of Vancouver on NE 117th Ave, this lift station will service a small industrial development as the city continues to grow and push its borders out.

City of Lemoore California
City of Lemoore | Turnkey Sewer Lift Station
311 GPM | 16.5′ TDH

Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.

Junction City Public Works
City of Junction City | Replacement Wastewater Lift Station
335 GPM | 128′ TDH

Romtec Utilities designed and supplied a wastewater lift station and control building to replace an existing municipal sewer system in the City of Junction City, Oregon.

Town of Samoa Washington Fire Hydrant Booster Pump Station
Town of Samoa | Housing Development & Fire Hydrant Booster Pump Station
1000, 200-600 GPM | 150′ TDH

Romtec Utilities was contacted to provide a design service order for a new booster pump station and control building for a housing development in the Town of Samoa. This booster pump station was designed to meet the immediate and future flow requirements of the development as it continued to expand.

bakersfield
City of Bakersfield | Deep Sewer Lift Station
2,200 GPM | 44.1′ TDH

A new residential development needed a deep well sewer lift station to handle high flows of municipal wastewater. The developer, MG3 Partners, purchased the lift station directly from Romtec Utilities, and Kern Construction completed the installation. The city will eventually assume ownership for handling future development in the area.

City of Shafter in California
City of Shafter | Multi-Phase Residential Development
500, 1000 GPM | 27.7′, 56.8′ TDH

Gossamer Grove is the largest housing development in the City of Shafter. Romtec Utilities provided the wastewater lift station for this development after establishing a standard lift station configuration with the City on previous projects.

Getting an Expandable Pumping System

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.