HRSG Pumping
Pumping Systems Integrated with Power Cogeneration Systems
Get Heat Recovery Steam Generator Pumping for High-Temperature Water Conditions
Romtec Utilities engineers pumping systems capable of handling the extremely hot water produced by Heat Recovery Steam Generators. Our systems integrate heat resistant components that stand up to the water conditions for this application.
Complete Design Engineering Documents with Full Scope of Supply & Services
Our lift stations are each designed and specified to meet specific requirements for each project. We supply complete engineering documents with component data sheets, site plan equipment layouts, scope of supply, and scope of services to detail the complete system from engineering through installation.
Integrate Your HRSG Pumping System with SCADA and Other Electrical Controls
Our electrical engineers are experienced at working with industrial clients to supply the very best electrical control panels for our HRSG pumping systems. This includes integrating new controls into SCADA systems and other existing electrical control systems at power generating facilities.
We Meet Special Design Requirements that are Unique to Your Project Needs
Not every HRSG system is the same, and the pumping systems and specifications can also change from plant to plant. Whether it’s handling water from other inlet lines or pumping to force mains for reuse circulation or treatment, Romtec Utilities will meet your exact pumping system needs.
Heat Recovery Steam Generator Pumping Projects
Exelon West Medway Generating Station | Power Plant Pumping Systems
70 GPM | 35′ TDH
The expansion of the Exelon Medway Generating Station required four unique pump stations to support future operations.
Orlando Utility Commission | HRSG Blowdown Pump Station
100, 800 GPM | 85.6′, 135′ TDH
Romtec Utilities designed, engineered, and supplied two pump stations for a power plant in Orlando, Florida.
Kings Mountain Energy Center | HRSG Blowdown Pumping
480 GPM | 35′ TDH
A new HRSG system required 3 industrial pump stations to provide water for its processes. This HRSG blowdown pump station needed to handle extreme pumping conditions.
Dan River Steam Station | Combined Cycle Blow Down Pumping
300 GPM | 20′ TDH
A large Power Company replaced the Dan River Steam Station with a new gas fired power plant and needed a new pump station to handle medium flows of blow down water from the heat recovery steam generator.
Basin Electrical Power Cooperative | Industrial Wastewater Pumping
100 GPM | 25′ TDH
This power generation facility installed a package lift station designed for medium sewage flows of industrial wastewater. Romtec Utilities worked with The Industrial Company (TIC) Wyoming, Inc. to design the industrial wastewater lift station for this plant.
Occidental Petroleum at Elk Hills, Inc. | Industrial Water Reuse
200 GPM | 115′ TDH
The Romtec Utilities pump station was carefully designed, documented, and supplied so that the Oxy installers and engineers would know exactly how the package pump station would integrate with the existing systems.
Getting a HRSG Pumping Station
Engineering
Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.
Project Support
With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.
Manufacturing
Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.
Construction
Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.
Commissioning
Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.
Warranty
With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.