Collection

Site-Specific Stormwater Collection Systems

Get a Stormwater Pump Station for Any Collection Application

Romtec Utilities engineers stormwater management pumping systems that meet all types of collection needs. Detention, retention, rainwater harvesting, oil/water separators, and others are just some of the stormwater collection pump stations that we regularly supply.

We Offer Systems from Low Flow to Super-High Flow Rates

Romtec Utilities will engineer your pump station to meet the specific pumping needs for your stormwater collection application. Our engineers can configure your system to handle low-flows and even 100-year storm events.

We ‘Startup’, Test, and Train Personnel on the Complete Stormwater System

Once your pump station is installed, a Romtec Utilities technician will “Startup” the system and perform testing and training for operation personnel. You also receive complete O&M documents to ensure the long-term success of your stormwater collection pump station.

We Meet Stormwater Pumping Environmental Standards of All 50 States

Romtec Utilities will help get your system completed while meeting or exceeding any and all applicable environmental standards for stormwater management and collection. Our engineering team will make sure your system functions correctly and will satisfy any environmental review.

Collection Projects

MARS Chocolate Factory Logo
Mars, Inc. | Stormwater Lift Station
22 GPM | 0′ TDH

The Romtec Utilities supplied lift station was installed onsite by Nordic Contracting Company, Inc.

Official Logo for Orange County Water Distrct
Orange County | Stormwater Lift Station
1,347 GPM | 72′ TDH

This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California.

US Navy Logo
NAVFAC | Industrial Process Water Pump Station
1000 GPM | 35′ TDH

The Romtec Utilities pump station is just the newest addition to the clean-up efforts, which began in 1981 at the NIROP site.

microsoft-logo
Microsoft Silicon Valley Campus | Lift Stations
400 GPM | 20.5′ TDH

Romtec Utilities supplied both the stormwater and the wastewater systems to achieve the “net-zero” usage goals on the project.

Trans Bay Cable
Trans Bay Cable | Stormwater Pump Stations for Converter Station
500 GPM | 25′ TDH

Romtec Utilities designed and supplied two stormwater pump stations for a converter station in the City of Pittsburg, California.

PSEG
Public Service Enterprise Group | Industrial Stormwater Pump Station
225 GPM | 11.7′ TDH

Romtec Utilities was contacted to design and supply a stormwater pump station as part of an improvement project at an industrial power switch station in Trenton, New Jersey.

Getting a Collection Station

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step – from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction costs and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site, everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation, our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pumping system is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.