Replacements & Retrofits

Replace & Repair Existing Pump Stations & Equipment

Romtec Provides Detailed Engineering Plans for Your System Retrofit or Replacement

Lift station retrofits and replacements can become money pits if they are not part of an engineered plan. Romtec Utilities evaluates the existing system and engineers each step from start to finish. This allows our clients to accurately budget their project and have confidence that the end result will function as needed.

Get the Pumps You Want on Your New Lift Station

Many retrofits and replacements involve upgrading or changing outdated pump technologies. Romtec Utilities can help engineer systems that upgrade from wet-dry to submersible or add above-grade skids. We make sure your new system has the pumps you need for now and the future.

Romtec Electrical Engineers Can Upgrade Your Controls During Retrofits or Replacements

During a retrofit or replacement project, Romtec Utilities will provide upgraded control panels for the lift station. Our electrical engineers will work with your preferences and existing configurations to provide new system controls that are suitable for your existing pump station.

Your Entire Lift Station Retrofit or Replacement is Warrantied for 1-Year

After Romtec Utilities commissions your new lift station, one of our on-site technicians will perform testing and training. With the system tested to fully meet the design requirements, Romtec Utilities will warranty the retrofitted system or the entire replacement system for 1 year.

View Sewer System Expansion Projects

City of Ashland Oregon
City of Ashland, OR | Municipal Sewer Lift Station Retrofit
156 GPM | 55.7′ TDH

Romtec Utilities retrofitted an existing wastewater lift station to meet rising flow rates in a neighborhood area of Ashland, Oregon.

City Living in a Rural Atmosphere
City of Norco | Sewer System Replacement Lift Stations
150, 200 GPM | 66.7′, 46.7′ TDH

Romtec Utilities designed, supplied, and manufactured two wastewater lift stations for the City of Norco, California.

City of Shafter in California
City of Shafter | Replacement Wastewater Lift Station
414 GPM | 27.5′ TDH

Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park.

HRWC-400X400
Halifax Regional Water Commission | International Wastewater Lift Station
220 GPM | 45.4′ TDH

Romtec Utilities was contacted to replace two aging wastewater lift stations with a modern system capable of handling their combined flow in Bedford Nova Scotia in Canada.

City of San Bernardino Water Department
San Bernardino Municipal Water Department | Wastewater Lift Station
188 GPM | 20.4′ TDH

The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.

City of Port Orchard Washington
City of Port Orchard | Replacing Old Lift Stations with Efficient Designs
3800 GPM | 142′ TDH

McCormick Communities came to Romtec Utilities with the need to replace an existing submersible station in the City of Port Orchard, Washington.

Getting a Wastewater Lift Station

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.