Sewer System Expansion

High & Low Flow Lift Stations for Expanding Sewer Infrastructure

Wastewater Lift Station with Large Wet Well

Meet Existing, or Establish New, Design Standards with New Lift Stations

Romtec Utilities works directly with municipalities to help engineers establish design standards on new lift stations for expanding sewer districts. Romtec can also help you meet any existing design standards that are in place as you expand an existing sewer system.

We Work with Developers, Engineers, & Municipal Clients on New Urban Growth

Sewer expansions are led by municipal agencies, private developers, and engineers employed privately and publicly. Romtec Utilities will work with any and all organizations to complete a design approved by all parties and deliver a fully produced lift station for your sewer system.

Locate the Lift Station Expansion at Your Site

Public land can be limited, and finding new land can be difficult. Romtec Utilities helps expanding sewer districts get new lift stations installed on the sites that are available. Romtec is experienced at configuring sewer lift stations to meet all types of site requirements, including existing utilities and size limitations.

Get Romtec Expertise on Expanding Your Sewer System

Romtec Utilities works on sewer system expansion projects everyday with all sizes of municipalities and sewer districts. The Romtec sales team, engineers, production staff, and on-site technicians all understand how to work on these types of projects, whether it’s the first expansion lift station or one of hundreds.

View Sewer System Expansion Projects

Yocha Dehe Wintun Nation
Yocha Dehe Wintun Nation | Wastewater Pump Station
206 GPM | 142.9′ TDH

The Mossy Creek project is a wastewater lift station for a new development to support the Cache Creek Casino Resort. The existing infrastructure could not support the additional homes and commercial locations.

Clark Regional 400X400
Clark Regional Wastewater District | Industrial Sewer Lift Station
82 GPM | 19.7′ TDH

Located at the northeastern edge of Vancouver on NE 117th Ave, this lift station will service a small industrial development as the city continues to grow and push its borders out.

Northshore Utility District
Northshore Utility District | Wet-Dry Lift Station for Residential Development
153 GPM | 130′ TDH

Romtec Utilities was contacted to provide the design and supply of a sewer lift station to connect 12 newly constructed homes in the Seattle metropolitan area.

City of Vancouver Washington
City of Vancouver | Wastewater Packaged Pump Station
272 GPM | 161.3′ TDH

Romtec Utilities was contacted to provide a package wastewater lift station for Columbia Palisades, a mixed-use development in Vancouver, Washington. This large development project by Airpark Development will transform 84-acres of an old rock quarry into an urban neighborhood with residential units, commercial spaces, and offices.

City of Beaumont California
City of Beaumont | Wastewater Lift Station for Master Planned Community
505 GPM | 158′ TDH

Romtec Utilities designed, supplied, and manufactured a packaged wastewater lift station for a new planned community development in the City of Beaumont, California. This is a large system will meet the sewage flow requirements for 981 new homes getting constructed.

City of Lemoore California
City of Lemoore | Turnkey Sewer Lift Station
311 GPM | 16.5′ TDH

Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.

Getting a Wastewater Lift Station

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.