(Click to expand and read more about each feature.)

We Work Quickly to Replace Failing Pump Stations

Working to meet timelines is one of our top selling features, and it can really help municipalities operating a failing pump station. Romtec Utilities engineers and delivers pump station replacements to get your sewer system back in operation. Short lead times are helped by prefabrication work and organized documentation.

Get the Components You Want for Your Pump Station Replacement

For pumps, valves, meters, control panels, and other major system components, Romtec Utilities will work with your preferred components and brands to develop your pump station replacement. We frequently work with all major brands and are able to advise on the best fit for your application if needed.

Our Technicians Provide Comprehensive Start-Up, Testing, & Training Services

Almost every pump station project is completed by commissioning the system and providing testing and training for your staff. This ensures that your new pump station operates as designed to successfully decommission the failing system. Our training services include O&M manuals for your continued reference and system operation.

You Get a 1-Year Warranty on Your Replacement Pump Station

After Romtec Utilities commissions your new lift station replacement, we will warranty the entire system for 1 year. We are confident that our comprehensive design documents, system testing, and training of your staff will lead to long-term success with your new lift station.

View Municipal Lift Station Replacement Projects

Getting a Municipal Lift Station Replacement

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process; from Preliminary Designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty. At Romtec Utilities, we stand behind our products, and strive to provide the most robust system possible for the given application, while also meeting the budgetary goals for your project.

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with the all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel. Romtec Utilities aims to not only design and supply complete systems, but to help to ensure the success of the system and all who are involved. Having our experienced field technicians on-site should provide a great sense of quality assurance knowing that the station will operate as designed and the personnel responsible for maintenance and upkeep will be prepared.