Industrial Water

Industrial Pumping Systems for Any Water Chemistry, Temperature, or Source

Industrial Pumping System

Romtec Understands the Varying Water Conditions at Industrial Facilities of All Types

Romtec Engineers and on-site technicians work on industrial systems in many different industries. This experience provides both expertise and familiarity working with water conditions that can vary. Your system will be engineered to meet the specific industrial water conditions you need handled.

Get Romtec Expertise with Electrical Engineering and Sophisticated Telemetry Systems

Our pumping system electrical controls and telemetry systems can be simple or sophisticated. Work with our electrical engineers to configure your control system to meet all types of needs, including SCADA integration, emergency power supply, variable frequency drives, and more.

Get the Materials You Want for the Pumping System Structural & Mechanical Components

Romtec Utilities engineers robust pumping systems that are built to withstand all types of industrial applications. We fabricate systems with wells out of concrete, fiberglass, stainless steel, and many other types of coatings. Mechanical components can be PVC, DI, stainless steel, and other materials.

Our Technicians Understand How to Work at Industrial Facilities

Romtec Utilities designs and supplies industrial pumping systems across the country, and the overwhelming majority require site work from one of our field technicians. We make sure our personnel arrive as scheduled and with the proper documentation and rules for work to conduct themselves at your facility.

Industrial Water Projects

TVA-logo
Tennessee Valley Authority at Shawnee Fossil Plant | Industrial Sewer
50 GPM | 67.7′ TDH

This industrial power plant needed a package lift station to meet the requirements for municipal wastewater.

Tesoro Oil and Water Separator Pump
Tesoro Corporation | Oil/Water Separator Stormwater Pump Station
400 GPM | 30′ TDH

A remote Tesoro Corporation industrial site needed this stormwater pump station to handle water discharged from an oil/water separator which processes on-site runoff.

British-Petroleum-Cherry-Point-Refinery
British Petroleum Cherry Point Refinery | Industrial Stormwater Runoff
350 GPM | 30′ TDH

This package lift station handles the medium flows of stormwater and process water drainage at this oil refinery.

Oxy 2
Occidental Petroleum at Elk Hills, Inc. | Industrial Water Reuse
200 GPM | 115′ TDH

This package pump station was configured to meet the medium flow requirements for this clean water power generation process and reuse system.

Untitled-1
Praxair Hydrogen Refinery | Mixed Industrial Water Pump Station
562 GPM | 200′ TDH

This was the first of two packaged pump stations needed to handle varying flows of industrial process water and stormwater at a hydrogen refinery.

Pacific Gas and Electric Company
Pacific Gas and Electric Company | Industrial Stormwater and Sewer
300 GPM | 23′ TDH

These three package lift stations were designed to meet medium flows of industrial process water with added low flows of industrial stormwater and wastewater.

Getting a Industrial Water Station

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.