Warehouse/Fulfillment Centers

Pumping System to Handle Water at Large Shipping/Fulfillment Warehouses

Commercial Zone Lift Station

Get a Pump Station for New Construction or at an Existing Facility

Warehouses and fulfillment centers are in big demand with our growing use of online shopping, and Romtec Utilities engineers pumping systems for new construction and for facilities that are expanding or replacing outdated equipment. Romtec engineers are experienced in developing design documents for both applications.

Romtec Handles Any Type of Water You Need for Your Operations

Large warehouses and fulfillment centers can require many types of pump stations to handle sewer, wastewater, stormwater, equipment washdown, pressure booster systems, and more. Romtec Utilities works with your site civil engineers to address all of your pumping needs for any type of water.

We Prefabricate Pump Station Assemblies with Superior Lead Times and Quality Control

Romtec Utilities delivers staged shipments of prefabricated assemblies that ensure a quality-controlled product delivery and easy installation on-site. These advantages help minimize disruption at functioning facilities and keep projects on schedule at new facilities.

Romtec Can Deliver Pumping Systems in All 50 States

For large organizations and commercial land developers, Romtec Utilities can engineer, produce, and deliver pump stations anywhere across the country. We have the size and experience to handle simultaneous projects nationally to get you a consistent product on all of your development needs.

Warehouse/Fulfillment Centers Projects

Long Beach Exchange Retail
Long Beach Exchange Retail | Five Identical Stormwater Pump Stations
150 GPM | 15.9′ – 18.7′ TDH

Romtec Utilities designed and supplied five stormwater pump stations for a new commercial development in Long Beach, California. All five of the pumping systems are nearly identical and are engineered with Ebara 2 hp submersible pumps.

United States Postal Service Logo
United States Postal Service | Wastewater & Stormwater Collection Lift Station
100 GPM | 29.7′ TDH

A new distribution center for the United States Postal Service in Portland, Oregon required a wastewater lift station. The lift station handles both wastewater and stormwater flows because the stormwater that is collected onsite is essentially wastewater due to fuel and other contaminants from a truck loading area.

Home Depot 400X400
Home Depot in Perris, California | Commercial Stormwater Pumping
900 GPM | 16′ TDH

The construction of a new Home Depot required a large detention pond and a new pump station to handle stormwater from the commercial development. This economical pump station uses 7.5hp Ebara pumps in a duplex configuration to meet the required flow rates to empty the detention pond.

Warehouse/Fulfillment Centers Station

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.