Romtec Utilities
1-541-496-9678
rusales@romtec.com
Contact Us
  • Water Types
    • Sewer
      • Wastewater
      • Municipal
      • Residential Development
      • Commercial Development
      • Industrial
      • Collection Systems
    • Stormwater
      • Stormwater Treatment
      • Detention Ponds
      • Commercial Development
      • Collection
      • “First Flush” Pumping
      • Flood Control
    • Process Water
      • Industrial Water
      • HRSG Pumping
      • Oily Water
      • Water Recirculation
      • Food Process
    • Potable Water
      • Domestic Booster Systems
      • Clean Water Intake
      • Water Recharge
      • Greywater Reuse
    • Other Water
      • High Temperatures
      • High/Low pH
      • Glycol Recovery Systems
      • High-Solids Water
      • Slurry/Gritty Water
      • Classified Water Conditions
  • Applications
    • Public Works
      • Municipal Lift Station
        Replacements
      • Sewer System Expansion
      • Replacements & Retrofits
      • Septic to Sewer Conversions
      • Prisons & Detention Centers
      • Municipal Collection
      • Flood Control
      • “First Flush”
      • Groundwater Reclamation
      • Booster Pump Station
      • Military Installations
      • Transportation
      • Now & Future Expansions
    • Development
      • Residential
      • Apartment Complexes
      • Stormwater Runoff
      • Detention Pond Pumping
      • Domestic Water
        Development
      • Water Reuse
      • Urban Growth
      • Booster Pump Station
    • Commercial
      • Mixed-Use Development
      • Data Centers
      • Airports
      • Hospitals
      • Prisons & Detention
        Centers
      • Landfills & Leachate
      • Equipment Washdown
      • Parking Lot Drainage
      • Ports
      • Railyards
      • Resorts/Golf Courses
      • Schools
      • Irrigation & Agriculture
      • Warehouse/Fulfillment Centers
    • Industrial
      • HRSG Blowdown
      • Power Generation
      • Oil & Gas
      • Food & Beverage
      • Pharmaceutical Waste
      • Data Center Cooling Waste
      • Corrosive/Caustic Pumping
    • Treatment
      • Treatment Plants
      • Stormwater Runoff
      • Water Reuse
      • “First Flush”
      • Scalping & Membrane
        Bio-Reactor
      • Oil/Water Separators
    • Flood Control
      • Stormwater Runoff
      • Detention Ponds
      • Municipal Collection
      • “First Flush”
      • 100-Year Storm
      • Underground Detention
  • Products
    • Pumping Systems
      • Stormwater Pump Stations
      • Wastewater Lift Stations
      • Booster Pump Stations
      • Clean Water Pumping
      • Industrial Pumping
      • Above-Grade Pump Stations
      • Irrigation Systems
      • Retrofit Systems
    • Assemblies
      • Valve Assemblies
      • Meter Assemblies
      • Skid Assemblies
      • Odor Control
      • Grinder Vault
      • Pressure Relief Vault
      • Water Control Systems
      • Deflector Panels
    • Electrical
      • Control Panels
      • Junction Boxes
      • SCADA Connect
      • Motor Control Center (MCC)
      • Disconnect Stands
    • Structures
      • Open Shelters
      • Booster Pump Buildings
      • Generator Buildings
      • Chemical Storage
      • Control Buildings
      • Control Kiosks
      • Custom Buildings – Office,
        Water Testing,
        Bathrooms, & More
    • Accessories
      • Level Sensors
      • Top Slab & Hatch
      • Cable Trays
      • Davit Cranes
      • Guide Bars & Brackets
      • Pump Elbows
    • Pumps
      • Submersible
      • Solids-Handling
      • Chopper/Cutter
      • Grinder
      • Axial Flow
      • Self-Priming
      • Vertical Turbine
      • Vertical Wet Well
      • In-Line Turbine
      • End-Suction Centrifugal
      • Split-Case
  • Projects
    • Water Type
      • Sewer
      • Stormwater
      • Process Water
      • Potable Water
      • Other Water
    • Locations
      • Pacific
      • Mountain
      • Central
      • Eastern
      • International
    • Application
      • Public Works
      • Development
      • Commercial
      • Industrial
      • Treatment
      • Flood Control
    • Industry
      • Public & Municipal
      • Contractors & Developers
      • Oil & Gas
      • Power Generation
      • Ports
      • Chemical Manufacturing
    • GPM
      • 5gpm – 50gpm
      • 50gpm – 100gpm
      • 100gpm – 300gpm
      • 300gpm – 500gpm
      • 500gpm – 1,000gpm
      • 1,000gpm – 5,000gpm
      • 5,000gpm – 10,000gpm
      • 10,000gpm +
  • Engineering & Services
    • System Design
      • Preliminary Designs
      • Budgetary Estimates
      • Sample Drawings
      • Complete Engineered Drawings
      • Full Design Submittals
      • Complete O&Ms
      • Sealed Plans
      • Full Bid Specifications
    • Electrical Engineering
      • Control Panel Design
      • Site Electrical Layout
      • Control Building Electrical Layout
      • Control Panel Repair/ Retrofit
      • Programming
      • Generator Sizing
    • Field Services
      • Training
      • System Repair Evaluation
      • System Retrofit Evaluation
      • Field Repair Services
      • Install Advising
    • Services
      • Start-Up & Testing
      • Field Evaluations
      • Repairs & Retrofits
      • Onsite Construction
      • Design Submittals
      • Prefabrication
      • Structural/Mechanical
        Integrations
      • System Commissioning
      • Shipping & Delivery
    • Procurement
      • Purchasing Cooperatives
      • Federal Contracts
      • State Contracts
      • Design-Build Contracts
      • Turnkey
  • Construction
    • Pump Stations
      • Precast Concrete Sumps
      • Steel Tanks
      • Fiberglass Wet Wells
      • Overflow Tanks
      • Below-Grade Assemblies
      • Above-Grade Assemblies
      • Control Panels
      • Odor Controls
    • Buildings
      • Building Construction
      • Shelter Construction
      • Booster Pump Buildings
      • Restroom Buildings
      • Electrical Control Buildings
      • Vehicle Storage Buildings
      • Gatehouses & Guardhouses
      • Treatment Buildings
      • SCADA & Monitoring Buildings
    • Repair & Retrofit
      • Existing Sump Retrofit and Repair
      • Top Slab & Hatch Retrofit
      • Control Panel Repair/Retrofit
    • On-Site Contracting
      • Excavation Contracting
      • Underground Construction
      • Site Grading & Paving
      • Building Demolition
      • Utility Hook-up Installation
      • Construction Estimation
      • Mechanical & Plumbing
      • Electrical Installations
      • Shoring & Dewatering
  • About Us
  • BLOG
Home Projects Industrial Crating and Packing - Stormwater Lift Station

512 GPM
29.1' TDH

Hannah Duncan March 4, 2021500gpm - 1,000gpm, Detention Ponds, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection

Industrial Crating and Packing – Stormwater Lift Station

Nielsen Industrial Sewer Lift Station Nielsen Industrial Sewer Lift Station
Control Panel and Shelter Control Panel and Shelter
Control Panel Front Control Panel Front
Nielsen Industrial Control Panel Nielsen Industrial Control Panel

Project Assets

DRAWINGS

PANEL DESIGN

DESIGN

Stormwater Lift Station Project Description

In the Industrial Crating and Packing project, Romtec Utilities supplied a stormwater pump station for a new industrial site in Tukwila, Washington. The project got its name from the end owner, Industrial Crating and Packing, a company that is described on their Facebook as a “’one-stop’ export and domestic packing company.”

For this project, Industrial Crating and Packing hired Barghausen Consulting Engineers, a firm that Romtec Utilities has worked with on multiple projects over the years. Understanding our capabilities and value, Barghausen brought this project to us. Romtec Utilities experts worked directly with the general contractor, Ace Communications, for the supply of this lift station.

The lift station for this project was needed to handle stormwater that is draining from the owners’ parking lot into a detention pond. The water from this detention pond drains into a Modular Wetland System (Filter) which then gravity feeds into the Romtec Utilities supplied lift station, allowing the water to be pumped out for treatment.

Stormwater Lift Station Design

The wet well in this Romtec Utilities supplied lift station is a 6’ inner diameter (ID), 13.75’ in depth, precast well. Inside, two 5 horsepower (HP) Ebara Submersible Pumps sit at the bottom of the wet well, and floats positioned at predetermined elevations are used for the primary level sensing to both start and stop the pumping cycle.

In addition to the pumps and level sensors, the Industrial Crating and Packing pump station features in-well valves, with 4” discharge piping and check valves. Placing the valves inside of the wet well eliminates the need for a separate valve vault, saving our customer both time and money on this project.

The check valves prevent the fluid that is being pumped from flowing back into the wet well. Backflow like this can create pressure that the system is not designed to handle, and reduces the ability of the lift station to effectively function.

In addition to the check valves inside the wet well, isolation valves are located in-line with the discharge piping outside the wet well. The isolation valves will allow maintenance personnel to control the flow of fluid in the event of necessary maintenance or repair.

Romtec Utilities would like to extend our appreciation towards Barghausen Consulting Engineers for their continued business, and towards Ace Communications for their work to install this lift station.

What Romtec Utilities Provided

  • Lift Station Design & Engineering
  • Package Lift Station Supplier
  • Package Lift Station Manufacturer
  • On-Site Construction Adviser
  • On-Site Start-Up Management
512 29.1′
GPM TDH

Romtec Utilities

Address:
18240 N. Bank Road
Roseburg, OR 97470

Contact Info:
Contact Us
Phone: (541) 496-9678
rusales@romtec.com
Fax: 541-496-0801

Career Opportunities

Office Hours:
7:00am-4:00pm/PT Monday–Friday.

IF YOU CALL AFTER HOURS OR HOLIDAY:
Please leave a phone message. Your call will be returned the next business day.

Products

  • Wastewater Lift Stations
  • Stormwater Pump Stations
  • Industrial Lift Stations & Reuse Systems
  • Clean Water & Turbine Pump Stations
  • Booster Pump Stations
  • Skid Assemblies

More Products

  • Control Buildings & Shelters
  • Flow Meter Vault Assemblies
  • Valve Vault Assemblies
  • Odor Control Systems
  • Inlet/ Outlet Structures
  • Component Sales
  • View Product Catalog

Services

  • LS Repair Retrofit Services
  • CP Repair Retrofit Services
  • Design/ Engineering Services
  • Lift Stations
  • Pump Stations
  • Stormwater
  • Packaged Pumping Systems

© 2000 – 2019 Romtec Utilities, Inc. All Rights Reserved


Privacy Policy

sales@romtec.wpenginepowered.com | (541)496-9678

Toggle the Widgetbar