A commercial sewer lift station was designed for the Kendall Road Business Park in Tyngsborough, Massachusetts.
Leander, Texas - Triplex Stormwater Pump Station
The pump system was designed to meet city stormwater detention requirements, which required new developments to carefully manage runoff. After construction, stormwater must be collected and released at the same rate as it was before the site was developed.
Midland, Texas – Private Stormwater Pump Station
4670GPM
16.9′ TDH
City of Camas, WA – Stormwater Pumping System
600GPM
16.0′ TDH
Romtec Utilities supplied Georgia Pacific with a stormwater runoff lift station that would meet their needs.
Utica East Ohio Midstream LNG Plant|Kensington, OH|75 GPM - 67' TDH
Utica East Ohio Midstream needed two new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, these pump stations were designed with double-wall fiberglass wet wells with interstitial leak detection. Both pumping systems included corrosion resistant components and sensors due to the potential presences of LNGs in the stormwater runoff. Pumps were engineered with 7.5 hp Ebara pumps in a duplex configuration, and different impellers were specified for each of the two pump stations meet slightly differing head requirements.





