The City of Hesperia Booster station receives water from the Victor Valley Reclamation facility, which discharges reclaimed water into tanks adjacent to the booster station.
University of California
720 GPM - 43.1' TDH
Adapting to the rising numbers of students seeking a higher education, UC Merced expanded their campus, and needed a wastewater lift station to accommodate new mixed-use residence halls.
Takara Sake
Berkeley, CA
512 GPM - 29.1' TDH
In the Takara Sake project, Romtec Utilities supplied an industrial food-process pump station to Takara Sake USA Inc., a Sake manufacturer based in Berkeley, California.
Industrial Crating and Packing
Tukwila, WA
512 GPM - 29.1' TDH
Woodburn Development LLC, with ICON Construction and Development, Emerio Design, and Canby Excavations were in need of a wastewater lift station for a new development. The Romtec supplied waste water wet well is a precast 10’ inner diameter (ID) well that is 36’ in depth.
City of Santa Paula
Santa Paula, CA
Romtec Utilities often supplies lift stations for new developments. In the Harvest at Limoneira project, a new residential development in Santa Paula, California, was in need of a wastewater lift station with a large wet well.