Romtec Utilities worked with Cardno as they were the project driver. RU designed and supplied the lift station to fit the needs of the large development.
Argent Development Solutions
Beaumont, CA
467 GPM - 99.3' TDH
The pump station was designed to the City of Beaumont’s standards which have adopted Eastern Municipal Water District requirements, as the city will also be the end owner of the system.
Prologis Meadows Lot A
Portland, OR
4500 GPM - 19.1' TDH
Romtec Utilities worked with Prologis as well as DOWL (Site Engineer) and K&E Excavation (Installing Contractor) on this project to ensure another successful system for Prologis, who will own and maintain the lift stations on the site.
Microsoft
Silicon Valley, CA
400 GPM - 20.5' TDH
Romtec Utilities supplied both the stormwater and the wastewater systems to achieve the “net-zero” usage goals on the project.
Rogue Community College
Grants Pass, OR
4,000 GPM - 0' TDH
Romtec worked with Marquess & Associates to provide them with the best value from an engineering, construction, and overall cost of maintenance standpoint.