Benham Ridge Homes – Residential Development Lift Station

Benham Ridge Homes – Residential Development Benham Ridge Homes – Residential Development
Wastewater Pump Station with Control Shelter Wastewater Pump Station with Control Shelter
Construction of the This is the Benham Ridge Homes – Residential Development Lift Station Construction of the This is the Benham Ridge Homes – Residential Development Lift Station
Installation of the Benham Ridge Homes – Residential Development Lift Station Installation of the Benham Ridge Homes – Residential Development Lift Station
Residential Development Wastewater Lift Station Residential Development Wastewater Lift Station
Benham Ridge Homes – Residential Development Lift Station by Romtec Utilities Benham Ridge Homes – Residential Development Lift Station by Romtec Utilities

Project Assets

Project Description

This medium flow sewage lift station was designed for a new development to meet the Sammamish Plateau Water and Sewer District lift station design standards. These standards specify a PLC controller with touchscreen HMI, SCADA options, a precast concrete valve vault, wet well, meter vault, and duplex submersible pumps. In addition to these design standards, this lift station needed to tie-in to an existing force main owned by the District. Romtec Utilities provided the tie-in force main designs and calculations as well as VFDs (variable frequency drives) to match the changing flow and pressure conditions of the existing force main.

What Romtec Utilities Provided

  • Lift Station Design & Engineering
  • Package Lift Station Supplier
  • Package Lift Station Manufacturer
  • On-Site Lift Station Construction Adviser
  • On-Site Start-Up Management
85 75′
GPM TDH

Why They Chose Romtec Utilities

Pacific Properties was referred to Romtec Utilities by the Sammamish Plateau Water and Sewer District as the lift station engineering firm that could meet the District’s lift station design standards. Romtec Utilities received the lift station design criteria from the Blue Line Group (Civil E.) and provided a design submittal that would satisfy the District’s review. Romtec Utilities also demonstrated its expertise in lift station design by providing a reliable solution for tying this lift station into an existing force main. Romtec Utilities integrated the flow meters, control panel, and variable frequency drives into a reliable electrical control system. This type of expert electrical engineering and the ability to meet the District’s standards made Romtec Utilities the preferred choice for this wastewater lift station.

Sammamish, WA|85 GPM – 75′ TDH