Federal Law Enforcement Training Center

Federal Training Center|Bruswick, GA|40 GPM - 15' TDH

jweddell5gpm - 50gpm, Eastern, Military Installations, Municipal Collection, Municipal Lift Station Replacement, Wastewater

This was a true lift station replacement by installing a new package lift station “in the hole” of the removed wet well. Submersible pumps in a duplex configuration were included to meet the low sewage flows from the federal training facility. The system valves were installed in the discharge piping inside the wet well to reduce cost and simplify the system. An outdoor alternator panel handles the controls for this package lift station. It was designed with floats for liquid level sensing and a basic alarm.

Project Site of the Lakehurst Naval Air Station Wastewater Lift Station

Lakehurst Naval Air Station|Trenton, NJ|250 GPM - 24.77' TDH

jweddell100gpm - 300gpm, Bid Packages, Eastern, Featured Projects, Military Installations, Municipal Collection, Sewer System Expansion, Tech Info, Wastewater

This wastewater lift station was designed to meet the standards of the Lakehurst Naval Air Station while remaining cost effective. A duplex pump configuration utilized submersible 7.5 HP Weil Slicer Pumps to handle suspended solids in the sewage. A UL listed control panel was designed and manufactured in a NEMA 4 enclosure for outdoor operation. Nolta floats were used for the in-well liquid level sensing. The below-grade structural components were designed and supplied precast concrete vaults painted with a marine epoxy exterior coating to prevent moisture incursion.

City of Brawley

City of Brawley Water Treatment | Brawley, CA | 1,350 GPM - 25' TDH

jweddell1,000gpm - 5,000gpm, Control Buildings Shelters, First Flush, Meter Vaults, Municipal Collection, Pacific, Process Water, Treatment Plants, Wastewater, Water Recirculation, Water Reuse

The City of Brawley needed this packaged lift station to handle high flows of wastewater at its municipal treatment plant. 12 HP submersible pumps in a duplex configuration were used to meet the high flow pumping needs and a conductive probe was used for liquid level-sensing. The in-ground valve assembly and meter assembly were each located in separate vault structures for a cost effective design and easy access. An outdoor, UL listed control panel was protected from weather and sunlight by a six-post shelter, which also covers the sump entry hatch and electric disconnect panel.

Marine Corps Base Camp Pendleton

US Marine Corps Base|Camp Pendleton, CA|1,585 GPM - 25' TDH

jweddell1,000gpm - 5,000gpm, Grinder Vault, Military Installations, Municipal Collection, Pacific, Sewer System Expansion, Slurry/Gritty Water, Wastewater

The Marine Corps Base Camp Pendleton needed this large wet-dry wastewater lift station to replace an existing system to allow the construction of new enlisted quarters. The new lift station included triplex dry-pit pumps to handle super-high flows of sewage from the facilities. An 8’ diameter precast concrete sump collects the sewage. Suction lines connect the sump to a 200-square-foot rectangular dry pit where the pumps, flow meter, and valve assembly are located. This lift station also includes an upstream grinder pit with a Macho Monster sewage grinder to pulverize solids into passable sizes.