Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.
Residential Development Wastewater Lift Station for City of Salinas, CA
50 GPM
17.4′ TDH
This lift station was designed to meet the low sewage flow requirements of a municipal lift station for a new residential development. The duplex pump configuration, solids-handling pumps, and inlet-line drop bowl provide suitable preventative measures for a reliable and long-term wastewater lift station. The controller is a PLC type designed with a pressure transducer for primary level sensing and a two float system for backup. The entire electrical was configured for Ethernet communication and alarm notification output to an existing SCADA system.
Town of Samoa|Samoa, CA| 1000, 200-600 GPM - 150' TDH
Romtec Utilities was contacted to provide a design service order for a new booster pump station and control building for a housing development in the Town of Samoa. This booster pump station was designed to meet the immediate and future flow requirements of the development as it continued to expand.
City of Lemoore|City of Lemoore, CA| 311 GPM - 16.5' TDH
Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.
City of Beaumont|Beaumont, CA| 505 GPM - 158' TDH
Romtec Utilities designed, supplied, and manufactured a packaged wastewater lift station for a new planned community development in the City of Beaumont, California. This is a large system will meet the sewage flow requirements for 981 new homes getting constructed.