Cocoa, Florida – Private Wastewater Lift Station

26GPM
97′ TDH

Hannah Duncan5gpm - 50gpm, Wastewater

Cocoa, Florida - Private Wastewater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS Romtec Utilities partnered on the Brevard Renewable Natural Gas (RNG) Facility in Cocoa, Florida, to design and supply a private wastewater lift station serving an industrial renewable energy operation. The system was engineered exclusively to manage facility wastewater – not the renewable natural gas production process - ensuring dependable wastewater conveyance while protecting sensitive production infrastructure. The project required a durable, ...
Wisconsin Paint Hangar Lift Station

Romtec Utilities partnered with Brown & Caldwell to design and deliver a paint wastewater lift station at an aviation facility in Wisconsin.

Hannah Duncan100gpm - 300gpm, Airports, Classified Water Conditions, Corrosive/ Caustic Pumping, Process Water, Slurry/Gritty Water, Wastewater

Wisconsin - Paint Wastewater Lift Station Project Assets DESIGN DRAWINGS Romtec Utilities partnered with Brown & Caldwell to design and deliver a specialized paint wastewater lift station at an aircraft hangar at a regional aviation facility in Wisconsin. This lift station was engineered to move wastewater created during painting and maintenance work. Unlike standard sanitary wastewater, paint wastewater can contain chemicals, cleaning agents, paint residue, solvents, and solids up to 2 inches in size. These ...

Romtec Utilities designed and supplied a leachate lift station for the Keystone Sanitary Landfill in Dunmore, Pennsylvania

Hannah Duncan500gpm - 1,000gpm, Corrosive/ Caustic Pumping, Eastern, Landfills & Leachate, Wastewater

Dunmore, Pennsylvania - Leachate Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS Romtec Utilities designed and supplied a leachate lift station for the Keystone Sanitary Landfill in Dunmore, Pennsylvania. This system helps manage leachate, a type of wastewater that forms when rainwater filters through landfill waste. The project was created to meet updated rules from the Pennsylvania Department of Environmental Protection, with a strict completion deadline of April 2025. Romtec Utilities’ solution included a ...