Santa Barbara County needed to retrofit an existing lift station site to effectively replace a failing system. The lift station retrofit needed to handle medium flows of municipal sewer from two inlet lines and make use of limited site space.
Dow Chemical Company|Plaquemine, LA|350 GPM - 90' TDH
This package wastewater lift station replacement was delivered largely preassembled for quick and simple installation by the customer. This procedure provided an expertly designed lift station that would uphold the privacy values of the facility. The fiberglass wet well arrived with mounting hardware, discharge piping, and the valve assembly preinstalled. Only the duplex solids handling pumps needed to be lowered after installation of the sump. An outdoor UL listed control panel was designed with float controls for liquid level-sensing and included an autodialer for communications.
NPS, Navajo Nation, & White Dove, Inc | Chinle, AZ | 58 GPM - 97' TDH
This National Park Service lift station replacement was a “turnkey” project designed to meet commercial, municipal, and Navajo EPA standards for medium sewage flows. The design included chopper pumps in a duplex configuration, an inlet-line drop bowl, and a separate below-grade valve assembly.
City of Port Orchard - Residential Pump Station
As part of the 250-unit Haven apartment complex in Port Orchard, the development needed a wastewater pump station.
Development Stormwater Pump Station in Gresham, Oregon
The California Air Resource Board (CARB) needed a wastewater pump station for their new facility being built in Riverside.