Samoa Boulevard, Arcata, CA – Turnkey Lift Station Replacement

Samoa Boulevard, Arcata, CA Samoa Boulevard, Arcata, CA
Triplex Sewage Wastewater Lift Station Triplex Sewage Wastewater Lift Station
Samoa Boulevard, Arcata, CA – Turnkey Lift Station Replacement Samoa Boulevard, Arcata, CA – Turnkey Lift Station Replacement
Turnkey Lift Station Replacement by Romtec Utilities Turnkey Lift Station Replacement by Romtec Utilities
Samoa Boulevard, Arcata, CA – Turnkey Lift Station Replacement by Romtec Utilities Samoa Boulevard, Arcata, CA – Turnkey Lift Station Replacement by Romtec Utilities

Project Assets

Project Description

This “turnkey” replacement lift station was designed, supplied, and installed to meet super-high sewage flow with infiltration and inflow requirements of a municipal wastewater lift station. Submersible solids-handling pumps in a triplex configuration were installed. The below-grade valve assembly includes plug valves, check valves, ball valves, a pumping port, and a pigging port. The UL listed control panel has an ultrasonic transducer for primary liquid level sensing, redundant float controls, and an autodialer alarm. VFDs were also included in the lift station controls.

What Romtec Utilities Provided

  • Lift Station Design & Engineering
  • Package Lift Station Supplier
  • Package Lift Station Installer
  • Package Lift Station Manufacturer
  • Package Lift Station Specification Writer
  • Lift Station Site Plan Layout Designer
  • On-Site Lift General Contractor
  • On-Site Start-Up Management
4 34.2′
MGD TDH

Why They Chose Romtec Utilities

Due to budget limitations the City of Arcata needed Romtec Utilities to provide the complete design/engineering, supply, construction, and installation of this lift station replacement. The exceptional inflow and infiltration requirements called for a big triplex lift station with sophisticated controls. Romtec Utilities solved the complex installation conditions in historic tidal land, with groundwater present just 3 feet below grade. The wet well alone required a 30’ deep hole with additional grades needed for the valve vault, gravity manhole, and force main manhole. The design, engineering, special equipment, and installation requirements for this project would not have been within the City’s budget without Romtec Utilities’ “site specific” packaged lift station approach, which was much more affordable and more reliable.

Arcata, CA|4 MGD – 34.2′ TDH