Municipal

Engineered Pumping Solutions for Municipalities & Public Entities

Wet Dry Lift Station Upgrade

Meet Existing, or Establish New, Design Standards

Romtec Utilities works directly with municipalities to help their engineers establish design standards that can be applied to new, retrofitted, and replacement municipal lift stations for all types of water collection applications. We also are able to meet any existing design standards!

Get a Collection System for Converting Septic to Public Sewer

Romtec Utilities provides pumping system designs to convert septic into a municipal sewer system. Romtec has experience with large and small septic conversions including entire neighborhoods and communities upgrading from individual septic systems.

Romtec Provides Expert Engineering Documents for Your Pump Station Approval

Romtec engineering drawings include complete documentation that clearly list the full scope of system components with data sheets and specifications. Romtec documentation also includes the full scope of services provided by Romtec Utilities as well as services to be carried out by the client and other entities for the project completion.

Get Any & All Pump Station Component Options

Flow meters, grinder vaults, odor control, and many other system components can be integrated into your sewer pump station. Romtec Utilities will work with any component manufacturer to get you the exact system functionality you need for your pump station design requirements.

View Municipal Collection Projects

HRWC-400X400
Halifax Regional Water Commission | International Wastewater Lift Station
220 GPM | 45.4′ TDH

Romtec Utilities was contacted to replace two aging wastewater lift stations with a modern system capable of handling their combined flow in Bedford Nova Scotia in Canada.

City of Lemoore California
City of Lemoore | Turnkey Sewer Lift Station
311 GPM | 16.5′ TDH

Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.

Clark County Water Reclamation District
Clark County Water Reclamation District | Wastewater & H2S Capable Lift Station
70 GPM | 47′ TDH

Romtec Utilities worked with the developer, Summit Club Nevada, and the local water authority, Clark County Water Reclamation District (CCWRD), to design the system for a housing development.

Snohomish County Washington
Snohomish County | Estuary Restoration Pump Station
4170 GPM | 26.5′ TDH

Romtec Utilities designed, supplied, and manufactured a powerful stormwater pump station with an integrated control building. The pump station was installed as part of a large estuary restoration project and is used to prevent inland flooding.

County of Santa Barbara Seal
Santa Barbara County | Wastewater Lift Station Retrofit
60 GPM | 20′ TDH

Santa Barbara County needed to retrofit an existing lift station site to effectively replace a failing system. The lift station retrofit needed to handle medium flows of municipal sewer from two inlet lines and make use of limited site space.

Clark Regional 400X400
Clark Regional Wastewater District | Wastewater Lift Station
392 GPM | 88.6′ TDH

Romtec Utilities was contacted to provide the design and supply of a wastewater lift station as a complete package for a new housing development in Vancouver, Washington. Romtec Utilities is experienced working with CRWWD’s lift station design standards.

Getting a Pump Station for Military Installations

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.