Corrosive/Caustic Pumping

Pump Corrosive & Caustic Fluids with Resilient Pumping Systems

Robust Structural Pumping Options for Handling Caustic Water Conditions

There are many materials suitable for use with corrosive or caustic water like concrete, fiberglass, and stainless steel. There are also many types of coatings and liners for any structure, including double-wall containment with leak detection. Romtec Utilities engineers caustic water pumping systems with any and all material options.

Our Systems are Engineered with High Standards for Operator Safety

Romtec Utilities always emphasizes the use of safe and well-documented system components and designs. We provide safety features like reliable fall protection and safety grates, limited access to confined spaces, above-grade manifolds, isolated power service disconnects, and much more for handling corrosive or caustic water.

Get Electrical Expertise & the Best Control & Communications Configuration

Romtec Utilities provides complete electrical engineering for difficult to pump water, including cable coatings and custom alarms. You can get the exact control system you need, including MCC configurations, SCADA integration, cellular telemetry, and more. We make it easy to monitor and operate your system.

Your System Includes a 1-Year Warranty After Testing & Training

After Romtec Utilities commission’s your pumping system for corrosive or caustic water conditions, our technician will perform testing and training on all aspects of the system design. Once fully tested, Romtec Utilities will warranty the entire system and train your operations personnel on its use.

View Corrosive/Caustic Projects

calpine-energy
Russel City Energy Center | Demineralized Process Water Pumping System
1350 GPM | 15′ TDH

Romtec Utilities was contacted to help on the design of an industrial pump station that would handle demineralized process water at the Russel City Energy Center in Hayward, California.

exelon-400x400
Exelon West Medway Generating Station | Power Plant Pumping Systems
30 – 70 GPM | 10′ – 35′ TDH

The expansion of the Exelon Medway Generating Station required four unique pump stations to support future operations.

Kings Mountain Energy Center
Middletown Energy Center | HRSG Blowdown and Process Pumping
480-850 GPM | 25′-35′ TDH

Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.

Orlando Utility Commission
Orlando Utility Commission | HRSG Blowdown Pump Station
100, 800 GPM | 85.6′, 135′ TDH

Romtec Utilities was hired to design and supply pump stations to support a combined-cycle power generation process that requires significant amounts of recirculated water to function for the Orlando Utility Commission in Orlando, FL.

bae
BAE Acetic Acid Plant | Corrosive Water Pumping Skid
300 GPM | 30′ TDH

BAE Systems, Inc. needed a new pumping system that could handle medium flows of industrial wastewater that was also skid mounted. This system was designed with self-priming pumps in a triplex configuration to avoid corrosive water conditions.

Marathon-Logo
Marathon Petroleum | Oil Refinery Process Wastewater
75 GPM | 125′ TDH

The Marathon Petroleum Refinery in Robinson, IL needed this new industrial process water pump station to handle its medium flows of highly acidic water combined with standard wastewater. A precast concrete sump included an interior Tnemec coating to withstand the water chemistry from a refinery testing lab.

Getting a Corrosive/Caustic Pumping System

Engineering

Engineering

Romtec Utilities provides full engineering and design services to meet the specific goals of your project. Romtec Utilities’ Engineers are experts in water conveyance systems across a wide array of water types and applications. We work with our clients through every step of the process, from preliminary designs and budgetary estimates, submittal and review processes, installation, and all the way through start-up, training, and warranty.

Project-Support

Project Support

With Romtec Utilities you gain the support of our dedicated project management team at every step-from planning through installation. Romtec Utilities covers a vast scope of services that help execute the design, supply, construction, testing, and training of your pump system to ensure its success at the site location.

Manufacturing

Manufacturing

Romtec Utilities provides a high level of system prefabrication prior to delivery of the system to the jobsite. This greatly reduces construction cost and installation time, as well as potential project delays and change orders. This high level of prefabrication can often reduce installation time from weeks to days. Additionally, Romtec Utilities takes pride in our quality control processes, ensuring that when the system is delivered to the job site everything will function as designed.

Construction

Construction

Romtec Utilities ensures the quality and success of every pumping system from the early stages of design, all the way through installation and construction. Romtec Utilities will send experienced installation advisors to the site who will advise the installing contractor throughout the installation process providing all parties with the reassurance that the station is constructed and ultimately functioning as designed.

Commissioning

Commissioning

Romtec Utilities’ startup, testing, and training services are essential to the success of any pumping system. Following installation our technicians are on-site working directly with all parties to field check the control panel, operate the pumps, perform system testing, and provide world class training to all maintenance personnel.

Warranty

Warranty

With Romtec Utilities, every complete pump station is covered with a standard one-year warranty. Romtec Utilities also provides ongoing support from our entire team throughout the lifetime of our products. This support is provided to ensure that every pump and lift station project is successful.