How long does it take to manufacture a complete package lift station?

jweddell

In a standard size and configuration, the complete package lift station with all structural, mechanical, and electrical will be manufactured and delivered in fewer than seven weeks. It typically takes four weeks to manufacture and deliver all of the structural and mechanical components. The pumps and control panel will typically take another two to three weeks.