Plantation Pipe Line Received a Stormwater Pump Station

Plantation Pipe Line|Polk County, GA|175 GPM - 90' TDH

jweddell100gpm - 300gpm, Eastern, Oil & Gas, Stormwater, Stormwater Runoff

This package stormwater lift station was configured to meet the medium runoff flow of this industrial property. One submersible centrifugal pump makes this a simplex station with an in-well check valve. The single pump handles high head conditions caused by 9,000 feet of 4” force main. Additional system valves are located in a below grade valve vault. An outdoor control panel includes floats for liquid level-sensing and a basic alarm for communication. A Thern crane was included with this station to raise and lower the pump.