Romtec Utilities was contacted to design and supply a wastewater lift station to replace an aging septic sewer systems for the Georgia Transmission Corporation’s (GTC) Electric Cooperative Training Center in Georgia.
Orlando Utility Commission|Orlando, FL| 100, 800 GPM - 85.6', 135' TDH
Romtec Utilities was hired to design and supply pump stations to support a combined-cycle power generation process that requires significant amounts of recirculated water to function for the Orlando Utility Commission in Orlando, FL.
DOW Chemical|South Charleston, WV| 60 GPM - 25' TDH
Union Carbide Corporation, a subsidiary of DOW Chemical, required a new stormwater pump station as part of a larger groundwater containment and remediation system in South Charleston, West Virginia.
BAE Acetic Acid Plant|Kingsport, TN|300 GPM - 30' TDH
BAE Systems, Inc. needed a new pumping system that could handle medium flows of industrial wastewater that was also skid mounted.
Utica East Ohio Midstream LNG Plant|Kensington, OH|150 GPM - 59' TDH
Utica East Ohio Midstream needed a new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, this pump station was designed with a double-wall fiberglass wet well with interstitial leak detection. The pumping system also included corrosion resistant components and sensors due to the potential presences of LNGs in the stormwater runoff. Pumps were engineered with 7.5 hp Ebara pumps in a duplex configuration, and a UL listed control panel was supplied with added cable lengths for installation outside of NFPA classified spaces near the pump station.





