Romtec Utilities provided a complete wastewater lift station for a sports park in Ohio. This lift station collects wastewater from the on-site facilities and then pumps into an existing force main.
BAE Acetic Acid Plant|Kingsport, TN|300 GPM - 30' TDH
BAE Systems, Inc. needed a new pumping system that could handle medium flows of industrial wastewater that was also skid mounted.
Utica East Ohio Midstream LNG Plant|Kensington, OH|150 GPM - 59' TDH
Utica East Ohio Midstream needed a new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, this pump station was designed with a double-wall fiberglass wet well with interstitial leak detection. The pumping system also included corrosion resistant components and sensors due to the potential presences of LNGs in the stormwater runoff. Pumps were engineered with 7.5 hp Ebara pumps in a duplex configuration, and a UL listed control panel was supplied with added cable lengths for installation outside of NFPA classified spaces near the pump station.
Federal Training Center|Bruswick, GA|40 GPM - 15' TDH
This was a true lift station replacement by installing a new package lift station “in the hole” of the removed wet well. Submersible pumps in a duplex configuration were included to meet the low sewage flows from the federal training facility. The system valves were installed in the discharge piping inside the wet well to reduce cost and simplify the system. An outdoor alternator panel handles the controls for this package lift station. It was designed with floats for liquid level sensing and a basic alarm.
Plantation Pipe Line|Polk County, GA|175 GPM - 90' TDH
This package stormwater lift station was configured to meet the medium runoff flow of this industrial property. One submersible centrifugal pump makes this a simplex station with an in-well check valve. The single pump handles high head conditions caused by 9,000 feet of 4” force main. Additional system valves are located in a below grade valve vault. An outdoor control panel includes floats for liquid level-sensing and a basic alarm for communication. A Thern crane was included with this station to raise and lower the pump.