Sandusky, Ohio – Sports Park Wastewater Lift Station
When a sports facility serves athletes, families, and tournament visitors, reliable wastewater infrastructure is essential. Romtec Utilities designed, manufactured, and supplied a custom sports park wastewater lift station for Cedar Point Sports Center in Sandusky, Ohio, helping the facility move wastewater into an existing pressure sewer line with confidence.
Sports Fields, Inc. needed a complete wastewater lift station that could support a busy recreation destination with changing daily demands. The nearby Sports Force Parks complex hosts large tournaments for baseball, softball, soccer, and lacrosse, so the system had to support high-use restrooms, concessions, and athletic facilities during peak event traffic.
Romtec Utilities worked with Barge Design Solutions to develop a practical pumping solution for the site. Connecting the lift station to the existing pressure sewer line helped limit additional site work and avoided the need for a longer sewer extension. Erie County owns and operates the completed lift station.
Wastewater Infrastructure for Cedar Point Sports Center in Sandusky, Ohio
Cedar Point Sports Center is located in Sandusky, Ohio, a northern Ohio city on the shore of Lake Erie. Because the area draws residents, travelers, athletes, and tournament guests, dependable wastewater infrastructure helps the facility serve large groups without disrupting the visitor experience.
As the county seat of Erie County, Sandusky supports residents, local businesses, and a strong visitor economy. Its location along Lake Erie makes it a regional destination for families, athletes, and tournament guests.
Sandusky is about one hour west of Cleveland and about one hour east of Toledo. This location helps Cedar Point Sports Center draw athletes and visitors from across northern Ohio and the larger Great Lakes region.
Project Partners
• End User/Operator: Erie County
• Contractor: Sports Fields, Inc. and Miller Brothers Construction
• Engineer: Barge Design Solutions
Sports Fields, Inc. led the sports facility construction work and turned to Romtec Utilities for a wastewater lift station that matched the needs of the site. The project called for a reliable system that could handle changing flows during practices, games, tournaments, and other high-traffic events.
Miller Brothers Construction installed the system. A Romtec Utilities technician provided on-site construction support, commissioned the lift station, and trained the owners and operators on the completed system.
Wastewater Pumping Challenge
The project team needed a wastewater lift station that could manage rapid changes in demand during practices, games, and tournaments while discharging into an existing pressurized sewer system. The controls also had to respond as pressure changed in the force main, and the complete package had to align with the site design and the owner’s operating requirements.
Romtec Utilities supplied a complete package with duplex EBARA pumps, an Allen-Bradley PLC panel, VFDs, a pressure transducer, a wet well, a valve vault, and backup floats. Romtec Utilities coordinated with Sports Fields, Inc. and Barge Design Solutions so the station matched the pressure sewer connection, installation plan, and facility needs.
Sports Center Pump System Designed for a Pressure Sewer
Because the station discharges into a pressurized system, its controls needed to adjust pump operation as force-main pressure changed.
To support those conditions, the pump station uses an Allen-Bradley PLC panel with VFDs and a pressure transducer. The pressure transducer communicates with the VFDs, which adjust pump speed as pressure changes in the force main. This control strategy helps the station maintain reliable operation during changing flow conditions.
The duplex lift station includes 7.5 hp EBARA pumps selected for the project’s required flow conditions. A sump pump inside the valve vault removes accumulated water to help protect station components. Nolta floats provide backup level sensing for added operational reliability.
Sports Park Wastewater Pump Station Components
The completed sports park wastewater lift station includes a 5-foot diameter wet well, 3-inch discharge piping, duplex EBARA pumps, a 3-inch valve vault, VFD controls, a pressure transducer, and backup floats. Each component supports reliable wastewater pumping, responsive control, and dependable operation for the sports facility.
Sports Fields, Inc., Miller Brothers Construction, Barge Design Solutions, and Romtec Utilities coordinated the design, supply, installation, startup, and operator training. The completed station connects Cedar Point Sports Center to existing wastewater infrastructure and gives Erie County a site-specific system for changing facility demands.
Every wastewater lift station has different site conditions, flow requirements, pressure demands, and operator preferences. Romtec Utilities works with engineers, contractors, developers, and municipalities to design and supply complete pump station systems that match the needs of each project.
Contact Romtec Utilities today to start planning a custom wastewater lift station that is engineered for your site, built for your system requirements, and supported from design through startup.
What Romtec Utilities Provided
- Lift Station Design & Engineering
- Package Lift Station Supplier
- Package Lift Station Manufacturer
- On-Site Lift Station Construction Adviser
| 75 | 60′ |
| GPM | TDH |