Romtec Utilities
1-541-496-9678
rusales@romtec.com
Contact Us
  • Water Types
    • Sewer
      • Wastewater
      • Municipal
      • Residential Development
      • Commercial Development
      • Industrial
      • Collection Systems
    • Stormwater
      • Stormwater Treatment
      • Detention Ponds
      • Commercial Development
      • Collection
      • “First Flush” Pumping
      • Flood Control
    • Process Water
      • Industrial Water
      • HRSG Pumping
      • Oily Water
      • Water Recirculation
      • Food Process
    • Potable Water
      • Domestic Booster Systems
      • Clean Water Intake
      • Water Recharge
      • Greywater Reuse
    • Other Water
      • High Temperatures
      • High/Low pH
      • Glycol Recovery Systems
      • High-Solids Water
      • Slurry/Gritty Water
      • Classified Water Conditions
  • Applications
    • Public Works
      • Municipal Lift Station
        Replacements
      • Sewer System Expansion
      • Replacements & Retrofits
      • Septic to Sewer Conversions
      • Prisons & Detention Centers
      • Municipal Collection
      • Flood Control
      • “First Flush”
      • Groundwater Reclamation
      • Booster Pump Station
      • Military Installations
      • Transportation
      • Now & Future Expansions
    • Development
      • Residential
      • Apartment Complexes
      • Stormwater Runoff
      • Detention Pond Pumping
      • Domestic Water
        Development
      • Water Reuse
      • Urban Growth
      • Booster Pump Station
    • Commercial
      • Mixed-Use Development
      • Data Centers
      • Airports
      • Hospitals
      • Prisons & Detention
        Centers
      • Landfills & Leachate
      • Equipment Washdown
      • Parking Lot Drainage
      • Ports
      • Railyards
      • Resorts/Golf Courses
      • Schools
      • Irrigation & Agriculture
      • Warehouse/Fulfillment Centers
    • Industrial
      • HRSG Blowdown
      • Power Generation
      • Oil & Gas
      • Food & Beverage
      • Pharmaceutical Waste
      • Data Center Cooling Waste
      • Corrosive/Caustic Pumping
    • Treatment
      • Treatment Plants
      • Stormwater Runoff
      • Water Reuse
      • “First Flush”
      • Scalping & Membrane
        Bio-Reactor
      • Oil/Water Separators
    • Flood Control
      • Stormwater Runoff
      • Detention Ponds
      • Municipal Collection
      • “First Flush”
      • 100-Year Storm
      • Underground Detention
  • Products
    • Pumping Systems
      • Stormwater Pump Stations
      • Wastewater Lift Stations
      • Booster Pump Stations
      • Clean Water Pumping
      • Industrial Pumping
      • Above-Grade Pump Stations
      • Irrigation Systems
      • Retrofit Systems
    • Assemblies
      • Valve Assemblies
      • Meter Assemblies
      • Skid Assemblies
      • Odor Control
      • Grinder Vault
      • Pressure Relief Vault
      • Water Control Systems
      • Deflector Panels
    • Electrical
      • Control Panels
      • Junction Boxes
      • SCADA Connect
      • Motor Control Center (MCC)
      • Disconnect Stands
    • Structures
      • Open Shelters
      • Booster Pump Buildings
      • Generator Buildings
      • Chemical Storage
      • Control Buildings
      • Control Kiosks
      • Custom Buildings – Office,
        Water Testing,
        Bathrooms, & More
    • Accessories
      • Level Sensors
      • Top Slab & Hatch
      • Cable Trays
      • Davit Cranes
      • Guide Bars & Brackets
      • Pump Elbows
    • Pumps
      • Submersible
      • Solids-Handling
      • Chopper/Cutter
      • Grinder
      • Axial Flow
      • Self-Priming
      • Vertical Turbine
      • Vertical Wet Well
      • In-Line Turbine
      • End-Suction Centrifugal
      • Split-Case
  • Projects
    • Water Type
      • Sewer
      • Stormwater
      • Process Water
      • Potable Water
      • Other Water
    • Locations
      • Pacific
      • Mountain
      • Central
      • Eastern
      • International
    • Application
      • Public Works
      • Development
      • Commercial
      • Industrial
      • Treatment
      • Flood Control
    • Industry
      • Public & Municipal
      • Contractors & Developers
      • Oil & Gas
      • Power Generation
      • Ports
      • Chemical Manufacturing
    • GPM
      • 5gpm – 50gpm
      • 50gpm – 100gpm
      • 100gpm – 300gpm
      • 300gpm – 500gpm
      • 500gpm – 1,000gpm
      • 1,000gpm – 5,000gpm
      • 5,000gpm – 10,000gpm
      • 10,000gpm +
  • Engineering & Services
    • System Design
      • Preliminary Designs
      • Budgetary Estimates
      • Sample Drawings
      • Complete Engineered Drawings
      • Full Design Submittals
      • Complete O&Ms
      • Sealed Plans
      • Full Bid Specifications
    • Electrical Engineering
      • Control Panel Design
      • Site Electrical Layout
      • Control Building Electrical Layout
      • Control Panel Repair/ Retrofit
      • Programming
      • Generator Sizing
    • Field Services
      • Training
      • System Repair Evaluation
      • System Retrofit Evaluation
      • Field Repair Services
      • Install Advising
    • Services
      • Start-Up & Testing
      • Field Evaluations
      • Repairs & Retrofits
      • Onsite Construction
      • Design Submittals
      • Prefabrication
      • Structural/Mechanical
        Integrations
      • System Commissioning
      • Shipping & Delivery
    • Procurement
      • Purchasing Cooperatives
      • Federal Contracts
      • State Contracts
      • Design-Build Contracts
      • Turnkey
  • Construction
    • Pump Stations
      • Precast Concrete Sumps
      • Steel Tanks
      • Fiberglass Wet Wells
      • Overflow Tanks
      • Below-Grade Assemblies
      • Above-Grade Assemblies
      • Control Panels
      • Odor Controls
    • Buildings
      • Building Construction
      • Shelter Construction
      • Booster Pump Buildings
      • Restroom Buildings
      • Electrical Control Buildings
      • Vehicle Storage Buildings
      • Gatehouses & Guardhouses
      • Treatment Buildings
      • SCADA & Monitoring Buildings
    • Repair & Retrofit
      • Existing Sump Retrofit and Repair
      • Top Slab & Hatch Retrofit
      • Control Panel Repair/Retrofit
    • On-Site Contracting
      • Excavation Contracting
      • Underground Construction
      • Site Grading & Paving
      • Building Demolition
      • Utility Hook-up Installation
      • Construction Estimation
      • Mechanical & Plumbing
      • Electrical Installations
      • Shoring & Dewatering
  • About Us
  • BLOG
Home Projects City of Woodburn, OR - Wastewater Lift Station

424 GPM
59.7' TDH

Hannah Duncan February 19, 2021300gpm - 500gpm, Meter Vaults, Pacific

City of Woodburn, OR – Wastewater Lift Station

Nielsen Industrial Sewer Lift Station Nielsen Industrial Sewer Lift Station
Nielsen Industrial Sewer Lift Station Nielsen Industrial Sewer Lift Station
Control Panel and Shelter Control Panel and Shelter
Control Panel Front Control Panel Front
Nielsen Industrial Control Panel Nielsen Industrial Control Panel

Project Assets

DRAWINGS

SITE-PLANS

DESIGN

PANEL DESIGN

Wastewater Lift Station Project Description

The Boone’s Crossing project is located in Woodburn, Oregon in the heart of the Willamette Valley in the Northwestern part of the state. Tulip fields, vineyards, and the natural beauty of the valley draw visitors to the town. Annual Tulip festivals and La Fiesta Mexicana are just two of the annual events that visitors and residents can come together and enjoy.

Woodburn Development LLC, with ICON Construction and Development, Emerio Design, and Canby Excavations were in need of a wastewater lift station for a new development. Romtec Utilities has completed projects with the City of Woodburn in the past, and was chosen for the supply of this lift station

Wastewater Lift Station Design

The Romtec supplied wastewater wet well is a precast 10’ inner diameter (ID) well that is 36’ in depth. This system is a “triplex” system with three 12 horsepower (HP) Flygt submersible pumps. In the event that the pumps need maintenance or need replaced, a davit crane is onsite to lift out the heavy pumps without causing injury to personnel.

The level sensors in this wastewater system are a pressure transducer (primary) and five Nolta Floats (secondary). These level sensors communicate with the controller, a Micrologixs 1400 PLC, to control the pumping cycles.

A disconnect stand and panel makes it easy and safe to disconnect the electrical components in the wet well in case of emergency or maintenance. Disconnect panels also make for easy visual inspection of the cables and connections.

In addition to the precast wet well, a precast 687 vault was supplied as a meter vault, and a precast 810 vault was supplied as a valve vault. Inside the meter vault, a 10” flowmeter measures the flows through the station to report back to the City of Woodburn. Separate meter vaults, like in this project, may be necessary if there is not enough room in the valve vault, or if there is not enough straight pipe in the valve vault to accommodate the flowmeter.

Romtec Utilities would like to extend our appreciation to the installing contractor, Canby Excavating Inc, for installing this lift station. We would also like to thank Woodburn Development LLC, ICON Construction and Development, and the City of Woodburn for the opportunity to join this project.

What Romtec Utilities Provided

  • Lift Station Design & Engineering
  • Package Lift Station Supplier
  • Package Lift Station Manufacturer
  • On-Site Construction Adviser
  • On-Site Start-Up Management
424 59.7′
GPM TDH

Romtec Utilities

Address:
18240 N. Bank Road
Roseburg, OR 97470

Contact Info:
Contact Us
Phone: (541) 496-9678
rusales@romtec.com
Fax: 541-496-0801

Career Opportunities

Office Hours:
7:00am-4:00pm/PT Monday–Friday.

IF YOU CALL AFTER HOURS OR HOLIDAY:
Please leave a phone message. Your call will be returned the next business day.

Products

  • Wastewater Lift Stations
  • Stormwater Pump Stations
  • Industrial Lift Stations & Reuse Systems
  • Clean Water & Turbine Pump Stations
  • Booster Pump Stations
  • Skid Assemblies

More Products

  • Control Buildings & Shelters
  • Flow Meter Vault Assemblies
  • Valve Vault Assemblies
  • Odor Control Systems
  • Inlet/ Outlet Structures
  • Component Sales
  • View Product Catalog

Services

  • LS Repair Retrofit Services
  • CP Repair Retrofit Services
  • Design/ Engineering Services
  • Lift Stations
  • Pump Stations
  • Stormwater
  • Packaged Pumping Systems

© 2000 – 2019 Romtec Utilities, Inc. All Rights Reserved


Privacy Policy

sales@romtec.wpenginepowered.com | (541)496-9678

Toggle the Widgetbar