Romtec Utilities designed, prefabricated, and delivered a complete wastewater lift station for Village at 47th, a senior apartment development in Tukwila, Washington.
The City of Shafter|Shafter, CA|400 GPM - 28.5' TDH
A suburb of the City of Shafter required a lift station package to repair and rehabilitate an existing wastewater sump. Duplex submersible centrifugal pumps and discharge pipe mounting brackets were fitted to a concrete slab poured in the bottom of the existing manhole. The Romtec Utilities package included the proper components to operate in this 26-foot-deep sump. An outdoor MultiSmart control panel utilizes conductive probes for primary and backup level controls and an autodialer for communications. This retrofit package saved about 60% the cost of a new lift station.
Kings Mountain Energy Center|Kings Mountain, NC|480 GPM - 35' TDH
A new HRSG system required 3 industrial pump stations to provide water for its processes. This HRSG blowdown pump station needed to handle extreme pumping conditions.
Middletown Energy Center|Middletown, OH|480-850 GPM - 25'-35' TDH
Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.
The City of Shafter|Shafter, CA|400 GPM - 28.5' TDH
A suburb of the City of Shafter required a lift station package to repair and rehabilitate an existing wastewater sump. Duplex submersible centrifugal pumps and discharge pipe mounting brackets were fitted to a concrete slab poured in the bottom of the existing manhole. The Romtec Utilities package included the proper components to operate in this 26-foot-deep sump. An outdoor MultiSmart control panel utilizes conductive probes for primary and backup level controls and an autodialer for communications. This retrofit package saved about 60% the cost of a new lift station.