Clark County Regional Wastewater District – Wastewater Lift Station
Project Description
This package lift station was designed to meet municipal standards for medium sewage flows at this new commercial complex. The duplex pump configuration and solids-handling pumps provide suitable preventative measures for a reliable and long-term wastewater lift station. The below-grade valve assembly included swing check valves, a pigging port, and flow meters. An on-site permanent generator and sheltered outdoor PLC control panel provide robust and programmable lift station controls. An ultrasonic transducer and a two float backup comprise the liquid level sensing controls.
What Romtec Utilities Provided
- Lift Station Design & Engineering
- Package Lift Station Supplier
- Package Lift Station Manufacturer
- Lift Station Site Plan Layout Designer
- On-Site Lift Station Construction Adviser
- On-Site Start-Up Management
198 | 51′ |
GPM | TDH |
Why They Chose Romtec Utilities
Olson Engineering contacted Romtec Utilities in the early phases of construction for a new commercial business park. The developer (Green Prairie, LLC) needed to install a wastewater lift station per the Clark County Regional Water District standards before the development could progress. Olson Engineering and the District worked with Romtec Utilities to design this lift station in compliance with the County’s standards. For Romtec Utilities, the design was straightforward because Clark County had worked with Romtec Utilities on previous projects to establish its lift station design standards. This lift station project was simple from a design point of view because Romtec Utilities understood what criteria were needed to get this system approved.