U.S. Army Base|Kalaheo, HI|74 GPM - 85' TDH

jweddell50gpm - 100gpm, Military Installations, Mixed Use, Wastewater, Wastewater Featured

Serving the US Army Base, Fort Shafter, this military neighborhood needed a lift station replacement package to be installed adjacent to the existing lift station. The Army and Romtec Utilities configured this submersible centrifugal pump station to pump the medium flow of municipal wastewater. The outdoor control panel utilizes conductive probes for primary and backup level controls and an autodialer for communications. A new generator was installed at grade above an existing generator pit. The owner supplied shelters for the panel and onsite generator.

Laguna Canyon Group|San Clemente, CA | 14 GPM - 22' TDH

jweddell5gpm - 50gpm, Commercial Development Stormwater, Flood Control, Mixed Use, Mixed Use Development, Modular Wetlands, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection, Stormwater Runoff, Stormwater Treatment

The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.