Serving the US Army Base, Fort Shafter, this military neighborhood needed a lift station replacement package to be installed adjacent to the existing lift station. The Army and Romtec Utilities configured this submersible centrifugal pump station to pump the medium flow of municipal wastewater. The outdoor control panel utilizes conductive probes for primary and backup level controls and an autodialer for communications. A new generator was installed at grade above an existing generator pit. The owner supplied shelters for the panel and onsite generator.
Cheyenne, Wyoming, Military Wastewater Lift Station
Romtec Utilities designed, prefabricated, and delivered a complete wastewater lift station for Village at 47th, a senior apartment development in Tukwila, Washington.
Kitsap County, Washington, Wastewater Pump Station
Romtec Utilities designed, prefabricated, and delivered a complete wastewater lift station for Village at 47th, a senior apartment development in Tukwila, Washington.
City of Shafter|Shafter, CA| 414 GPM - 27.5' TDH
Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.
Laguna Canyon Group|San Clemente, CA | 14 GPM - 22' TDH
The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.





