Microsoft Columbia Data Center – Mixed Commercial Wastewater
Project Description
To handle a combination of sewer and cooling process wastewater, this commercial facility purchased four identical Romtec Utilities package lift stations. This was the third of four lift stations supplied to Microsoft’s 70-acre data center. Aircraft rated hatches are included for each lift station to handle heavy forklift traffic. Valve cans provide easy access to the below grade check valves with much less material costs than a valve vault. An outdoor UL listed control panel includes floats for level controls and an intrinsically safe barrier for in-well electrical controls.
What Romtec Utilities Provided
- Lift Station Design & Engineering
- Package Lift Station Supplier
- Package Lift Station Manufacturer
- On-Site Lift Station Construction Adviser
- On-Site Start-Up Management
120 | 60′ |
GPM | TDH |
Why They Chose Romtec Utilities
M+W Group (Civil E.) specified Romtec Utilities to provide four site specific package lift stations as part of a larger construction project. M+W Group was responsible for designing this 500,000-square-foot data center and specializes in facilities for technology-based clients but not wastewater lift stations. Romtec Utilities provided the design, engineering, and supply services while meeting McKinstry Company’s budget (GC) for this portion of the project. Utilizing Romtec Utilities for these services provided Microsoft with four lift stations that are all designed with a common layout, operation, and maintenance plan.