Oil & Gas

Recent Projects

West Lafayette Logo
City of West Lafayette | Three Industrial Systems

F.A. Wilhelm originally brought us the “Hot Sump Basin” for our review, and then subsequently added on three other systems. RU ended up doing three total systems including: an Oil Water Separator, a Hot Sump Basin, and a Wash Drains Basin. All these systems will be located inside a building.

Oil & Gas

Gulf Coast Growth Ventures
Gulf Coast Growth Ventures | Wastewater Pump Station

The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.

Gulf South Pipeline
Gulf South Pipeline Company | Stormwater Pump Station
50 GPM | 15.1′ TDH

The Westlake Compressor Stormwater Pump Station in Louisiana is just one of three recent Romtec Utilities projects for the Gulf South Pipeline Company, also known as the Boardwalk Pipeline partners.

Boardwalk Pipeline Partners
Boardwalk Pipeline Partners | Midstream Pipeline Stormwater Pump Station
100 GPM | 11′ TDH

The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.

Momentum 400X400
Utica East Ohio Midstream LNG Plant | Double-Wall Fiberglass Sumps
75 GPM | 67′ TDH

Utica East Ohio Midstream needed two new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, these pump stations were designed with double-wall fiberglass wet wells with interstitial leak detection.

Marathon-Logo
Marathon Petroleum | Oil Refinery Process Wastewater
75 GPM | 125′ TDH

The Marathon Petroleum Refinery in Robinson, IL needed this new industrial process water pump station to handle its medium flows of highly acidic water combined with standard wastewater.

Momentum 400X400
Utica East Ohio Midstream LNG Plant | Double-Wall Fiberglass System
150 GPM | 59′ TDH

Utica East Ohio Midstream needed a new pump station to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, this pump station was designed with a double-wall fiberglass wet well with interstitial leak detection.

rockmart-ga
Plantation Pipe Line | Low-Cost Stormwater Pump Station
175 GPM | 90′ TDH

This package stormwater lift station was configured to meet the medium runoff flow of this industrial property. One submersible centrifugal pump makes this a simplex station with an in-well check valve. The single pump handles high head conditions caused by 9,000 feet of 4” force main.

Untitled-1
Praxair, Inc. | Super-High Flow Industrial Lift Station
1800 GPM | 33.5′ TDH

A liquid hydrogen plant required this large 20’ deep lift station to handle super-high flows of industrial wastewater. In order to provide redundancy and expanded pumping capabilities, triplex submersible centrifugal pumps were specified in the 8’ diameter sump.

Dow Chemical Company
Dow Chemical Company | Replacement Fiberglass Lift Station
50 GPM | 90′ TDH

This package wastewater lift station replacement was delivered largely preassembled for quick and simple installation by the customer. This procedure provided an expertly designed lift station that would uphold the privacy values of the facility.

Tesoro Oil and Water Separator Pump
Tesoro Corporation | Oil/Water Separator Stormwater Pump Station
400 GPM | 30′ TDH

A remote Tesoro Corporation industrial site needed this stormwater pump station to handle water discharged from an oil/water separator which processes on-site runoff. Submersible centrifugal pumps were used in a duplex configuration in this shallow wet well.

British-Petroleum-Cherry-Point-Refinery
British Petroleum Cherry Point Refinery | Industrial Stormwater Runoff
350 GPM | 30′ TDH

This package lift station handles the medium flows of stormwater and process water drainage at this oil refinery. A stormwater plan is required at most industrial facilities and BP proactively chose a reliable lift station to manage its environmental footprint.

Dow Chemical Company
Dow Chemical Company Louisiana Operations | Prefabricated Pump Station
8500 GPM | 32′ TDH

This package pump station was designed to respect the confidentiality of this industrial facility. The entire system was delivered with much of the hardware preinstalled in the fiberglass wet well to facilitate simple, “drop-in” installation.

Untitled-1
Praxair Hydrogen Refinery | Self-Priming Pumping Skid
540 GPM | 280′ TDH

This packaged pump station was the second of two pump stations supplied for industrial process water and stormwater at two Valero oil refineries. The design criteria specified varying flows which required a duplex pump configuration with an included “jockey” pump to handle the smaller flows.

texas-association-of-counties
Ajax Gas Plant | Industrial Stormwater and Process Water
200 GPM | 50′ TDH

This package pump station was designed to meet a low flow of industrial process water with added low flows of industrial stormwater. The dual purposes of this pump station required shaft-driven centrifugal pumps with the motors located above-grade.

Untitled-1
Praxair Hydrogen Refinery | Mixed Industrial Water Pump Station
562 GPM | 200′ TDH

This was the first of two packaged pump stations needed to handle varying flows of industrial process water and stormwater at a hydrogen refinery. Submersible centrifugal pumps in a duplex configuration also included a submersible “jockey” pump.