Elsinore Valley Municipal Water District – PVC Lined Precast Concrete Wet Well
Project Description
This packaged lift station was designed to meet the medium flows of sewage from an upscale apartment development. The concrete wet well was precast with Ameron T-Lock lining to protect the concrete from hydrogen-sulfide off-gassing. Ebara submersible sewage pumps in a duplex configuration provide redundant pumping capabilities suitable for the medium head conditions. This lift station also includes a bioxide odor control system in the design. A UL listed control panel provides the complete electrical controls with an autodialer for communications.
What Romtec Utilities Provided
- Lift Station Design & Engineering
- Package Lift Station Supplier
- Package Lift Station Manufacturer
- Lift Station Site Plan Layout Designer
- On-Site Lift Station Construction Adviser
- On-Site Start-Up Management
262 | 53.9′ |
GPM | TDH |
Why They Chose Romtec Utilities
GLJ Partners contacted Romtec Utilities about a lift station for an apartment development in 2008. Romtec Utilities provided the designs, but the project was shelved after the housing bubble burst. Four years later, GLJ contacted Romtec Utilities after finding the company name on the lift station design documents. GLJ was impressed that Romtec Utilities had maintained the full scope of project details. This allowed the lift station to be quickly developed without requiring another agency other than the municipal review by the Elsinore Valley Municipal Water District. Romtec Utilities worked to get the plans approved and helped GLJ proceed with its development.